|
End of Life
<br />Type Facility Project Year Due Observed condition ROM 2022 $
<br />Building Fire Station 13 Replace with larger facilities End of Life $15,000,000
<br />Park Facilities Stenzel Park General Refresh / renovation End of Life $6,750,000
<br />Fields San Leandro Ball Park Refresh / renovation End of Life $5,000,000
<br />Building Fire Station 12 Refresh / renovation End of Life $15,000,000
<br />Building Fire Station 09 Refresh / renovation End of Life $15,000,000
<br />Park Facilities Heath Park Refresh / renovation End of Life $1,600,000
<br />Landscaping San Leandro Bl Planted area under BART tracks from the bart station sout Refresh / renovation End of Life $1,592,430
<br />Building Main Library Roof Replace End of Life $1,065,000
<br />Landscaping Halcyon Passive Park aka Linear Park Refresh / renovation End of Life $988,800
<br />Landscaping Doolittle DrMedians from Davis St north to 260 Doolittle Drive Refresh / renovation End of Life $962,310
<br />Landscaping Halcyon Dr Olivia St to Hesperian Ave incl north side of street between OlRefresh / renovation End of Life $856,470
<br />Building Public Works Service Center Roof Replace End of Life $794,000
<br />Building Stenzel Park Restroom and scorebooth Replace End of Life $750,000
<br />Park Facilities Thrasher Park Skatepark Replace End of Life $750,000
<br />Landscaping Fairway AveMedians between Doolittle Dr and Aurora Ave Refresh / renovation End of Life $663,960
<br />Building Thrasher Park Restroom and scorebooth Refresh / renovation End of Life $560,000
<br />Surface Lot 1366 East 14th Street Reconstruct End of Life $537,600
<br />Landscaping Doolittle DrMedian from W. Ave. 135th south to Flood Control canal ‐ no i Refresh / renovation End of Life $531,900
<br />Equipment Heron Bay Tidegates End of Life $500,000
<br />Park Facilities Heron Bay Entry Refresh / renovation End of Life $500,000
<br />Landscaping Springlake DrMedians from Hesperian Blvd west to Washington Ave. Orna Refresh / renovation End of Life $435,330
<br />Landscaping MacArthur BlMedians from Dutton Ave south Estudillo Ave Refresh / renovation End of Life $382,920
<br />Landscaping Westgate PkwyLandscaped area on west side of street from Williams St toRefresh / renovation End of Life $368,250
<br />Play Equip Family Aquatic Center Pool at Manor Park Replace End of Life $350,000
<br />Landscaping Lewelling BlWicks Bl to Heron Bay Development Slated for rehab ‐ paid forRefresh / renovation End of Life $330,000
<br />Building Fire Station 12 Roof Replace End of Life $325,000
<br />Landscaping San Leandro Bl Landscaping in planting strips (bulb‐outs) from W. Estudill Refresh / renovation End of Life $297,000
<br />Landscaping Hesperian BlTriangle property at the intersections of E14th St and 150th ARefresh / renovation End of Life $289,140
<br />Landscaping Davis St South side of the Maltester/Polvorosa overcrossing Refresh / renovation End of Life $288,000
<br />Equipment Halcyon Park Well Replace End of Life $250,000
<br />Equipment Thrasher Park Well Replace End of Life $250,000
<br />Equipment Washington Manor Park East Playstructure Replace End of Life $250,000
<br />Landscaping E. 14th St.Five medians between 136th Ave and 144th Ave Refresh / renovation End of Life $225,000
<br />Landscaping Washington Ave Northeast corner of the Halcyon Dr intersection Refresh / renovation End of Life $216,000
<br />Building Fire Station 09 Roof Replace End of Life $200,000
<br />Landscaping E. 14th St.Landscaped strip from Bristol Blvd to Farrelly Dr along the frontaRefresh / renovation End of Life $184,560
<br />Landscaping Hillside DrPlanted area between 2150 and 2112 Hillside Dr from sidewalk tRefresh / renovation End of Life $168,000
<br />Landscaping Doolittle DrLandscaped areas in between sidewalk and curb on east side oRefresh / renovation End of Life $150,000
<br />Landscaping E. 14th St.All medians and landscaped areas in parking lot behind 1495 E. Refresh / renovation End of Life $150,000
<br />Landscaping MacArthur BlPlanting strip on east side of street along freeway wall from DRefresh / renovation End of Life $150,000
<br />Landscaping MacArthur BlPlanting strip on east side under I‐580 from Dowling Blvd norRefresh / renovation End of Life $150,000
<br />Landscaping Williams StLandscaped area along fence line on south side of street from DRefresh / renovation End of Life $150,000
<br />Landscaping Merced StCorner lot at Wicks Blvd next to 14251 Merced St. Sell??? Refresh / renovation End of Life $131,370
<br />Landscaping Davis St Costco Area Northwest corner of Warden Ave and Davis St Refresh / renovation End of Life $129,600
<br />Landscaping E. 14th St.Two (2) planter boxes in alleyway between 1350 & 1378 E. 14thRefresh / renovation End of Life $117,000
<br />Landscaping San Leandro Bl Lot at Coburn Ct ‐ No irrigation Refresh / renovation End of Life $114,390
<br />Landscaping Westgate PkwyMedians at intersection of Timothy Drive and Westgate PaRefresh / renovation End of Life $111,600
<br />Landscaping San Leandro Bl Planted area between private property fence line and sidewRefresh / renovation End of Life $100,050
<br />Park Facilities Marina Park Volleyball Court Refresh / renovation End of Life $100,000
<br />Landscaping Hesperian BlMedians from Grace St south to Springlake Dr ‐ no irrigation. Refresh / renovation End of Life $77,820
<br />Landscaping Parrot StLandscaping on both sides of the street between E. 14th St and WRefresh / renovation End of Life $72,900
<br />Landscaping Farnsworth AveShrubs and trees on both sides of Farnsworth Ave south ofRefresh / renovation End of Life $66,000
<br />Landscaping Farnsworth AveLandscaping on three (3) corners of Farnsworth Ave and MRefresh / renovation End of Life $51,000
<br />Landscaping Merced StCenter median on Wicks Blvd across from corner lot Refresh / renovation End of Life $48,210
<br />Landscaping Farnsworth AveTriangular landscaped island at the intersection of CorvalliRefresh / renovation End of Life $44,550
<br />Landscaping Broadmoor BlTwo (2) medians, one on the north side and one on the sout Refresh / renovation End of Life $37,350
<br />Landscaping Floresta BlMedians from Washington Ave west to Fremont Ave Refresh / renovation End of Life $30,810
<br />Landscaping Farnsworth AveLandscaping on northeast corner of the Burkhart Ave interRefresh / renovation End of Life $27,000
<br />Landscaping Blossom Way between Bancroft Avenue and E. 14th Refresh / renovation End of Life $26,640
<br />Landscaping Huff AveMedian at intersection of Huff Ave and Estudillo Ave – no irrigatioRefresh / renovation End of Life $24,000
<br />Landscaping Dutton BlMedian across from the front of Washington Elementary School Refresh / renovation End of Life $22,440
<br />Landscaping Davis St South side of street from Wayne Ave to Pierce Ave incl frontage roRefresh / renovation End of Life $16,800
<br />Landscaping Floresta BlTriangular landscaped island at the intersection of Monterey Bl Refresh / renovation End of Life $9,600
<br />Landscaping Merced StIsland with the Bonaire Neighborhood Entry sign at intersection Refresh / renovation End of Life $9,600
<br />Landscaping Broadmoor Bl Southwest corner of Broadmoor Blvd at Bancroft Ave Refresh / renovation End of Life $9,000
<br />Landscaping W. Juana AveFive (5) medians from Washington Ave to E. 14th Street Refresh / renovation End of Life $9,000
<br />Landscaping Dowling BlThree (3) medians – (2 large & 1 small) at intersection across froRefresh / renovation End of Life $8,100
<br />Total End of Life $76,356,500
|