Laserfiche WebLink
Existing Funding for ongoing <br />projects <br />Past budgets were organized to fully fund projects before work was started. <br />This results in carrying construction funds forward while the design phase <br />was completed. <br />Moving forward our goal is to fund work in the year that it will occur. <br />Projects on hold need additional funding. <br />4 <br />Project Name Total <br />Street Overlay / Rehabilitation $15,735,595 <br />Mulford Marina Branch Library $8,859,000 <br />Shoreline Park $7,610,000 <br />Memorial Park Redevelopment $4,671,000 <br />Street Sealing $3,204,667 <br />East 14th UG Utility $2,600,000 <br />WPCP Dirt Relocation $2,296,709 <br />Storm Drain Trash Capture $2,091,364 <br />Hesperian Bike Lanes $1,479,000 <br />MacArthur Superior Round About $1,225,957 <br />Washington Ave Reconstruction $1,201,870 <br />Fire Station Study / Concepts $1,200,000 <br />Peralta Ave SS Upsize $1,000,000 <br />Washington Manor Pool Renovation $1,000,000 <br />Dutton Ave SS Upsize $998,379 <br />City Park / Open Space Major Maintenance $945,000 <br />Teagarden SS Lift Station Renovation $915,000 <br />San Sewer Collection System Repair $901,274 <br />Beverly SS Upsize $900,000 <br />City Building Major Maintenance $900,000 <br />Lake Chabot Road Stabilization $900,000 <br />PWSC Replace Fuel Tanks $850,000 <br />Shoreline Fiber Optic $640,000 <br />East 14th Pedestrian Lighting $639,484 <br />Benedict SS Lift Station Renovation $635,000 <br />Sylvan SS Lift Station Renovation $600,000 <br />Bridge and Embankment Maintenance $547,479 <br />Doolittle Streetscape Davis to Fairway $400,000 <br />Steven Taylor Sanctity of Life Memorial $380,000 <br />Farrelly SS Upsize at Dorchester $375,000 <br />Police and South Offices Improvements $330,000 <br />Wicks/Manor Signal $326,617 <br />East 14th SS Upsize $250,000 <br />Sidewalk Program $250,000 <br />Merced SS Lift Station $220,000 <br />Davis St San Sewer Manhole & Pipe Rehab $199,592 <br />Storm Drain Video Inspection $180,000 <br />Neighborhood Traffic Calming Program $120,313 <br />Davis Doolittle Traffic Improvements $120,000 <br />Marina Blvd SS Diversion at Cherry $100,000 <br />Sybil Ave SS Diversion $70,000 <br />Total Acitve $67,868,300 <br />Family Aquatic Center Competition Pool $5,200,000 <br />New Downtown Park $3,000,000 <br />Casa Peralta Improvements $1,400,000 <br />Chabot Park Improvements $1,249,000 <br />Total On Hold $10,849,000