BID SUMMARY
<br />BID OPENING Sposeto Engineering Kerex Engineering, Inc.
<br />DATE: April 19, 2023 4558 Contractors Place 4941 Pacheco Boulevard
<br />TIME: 3:00 pm Livermore, CA 94551 Martinez, CA 94553
<br />LOCATION: City Clerk's Office Phone: (925) 443-4200 Phone: (925) 387-8913
<br />Fax: (925) 443-6800 Fax: (925) 387-0853
<br />ITEM
<br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST
<br />1 Mobilization, Staging, and
<br />Stockpiling per Section 7 and
<br />Section 9
<br />1 LS $55,000.00 $55,000.00 $27,000.00 $27,000.00 $40,000.00 $40,000.00
<br />2 Temporary Traffic Control per
<br />Section 600
<br />1 LS $55,000.00 $55,000.00 $21,000.00 $21,000.00 $40,000.00 $40,000.00
<br />3 Curb Cut Ramp Type A or B per
<br />Section 303
<br />47 EA $7,000.00 $329,000.00 $6,500.00 $305,500.00 $7,500.00 $352,500.00
<br />4 Curb Cut Ramp Type C or D per
<br />Section 303
<br />48 EA $6,500.00 $312,000.00 $6,000.00 $288,000.00 $7,500.00 $360,000.00
<br />5 Dome and Landing Replacement
<br />per Section 303 (Allowance)
<br />4 EA $3,000.00 $12,000.00 $2,500.00 $10,000.00 $1,500.00 $6,000.00
<br />6 Retaining Curb Replacement per
<br />Section 303 (Allowance)
<br />4 EA $2,000.00 $8,000.00 $600.00 $2,400.00 $3,000.00 $12,000.00
<br />7 Sidewalk per Section 303 1,500 SF $30.00 $45,000.00 $25.00 $37,500.00 $25.00 $37,500.00
<br />8 Curb and Gutter per Section 303 400 LF $115.00 $46,000.00 $102.00 $40,800.00 $90.00 $36,000.00
<br />9 AC Tie In per Section 303 400 SF $30.00 $12,000.00 $22.00 $8,800.00 $30.00 $12,000.00
<br />10 Concrete Valley Gutter / Apron
<br />per Section 303
<br />1,500 SF $45.00 $67,500.00 $45.00 $67,500.00 $40.00 $60,000.00
<br />11 Curb Storm Inlet Adjustment
<br />within Ramp Flare per 303
<br />3 EA $5,000.00 $15,000.00 $6,000.00 $18,000.00 $4,000.00 $12,000.00
<br />12 Paint Curb Red per Section 314 50 LF $20.00 $1,000.00 $38.00 $1,900.00 $30.00 $1,500.00
<br />13 Relocate Roadside Sign on New
<br />Post per Section 315
<br />10 EA $800.00 $8,000.00 $700.00 $7,000.00 $650.00 $6,500.00
<br />14 Adjust Utility Box to Grade per
<br />Section 301
<br />10 EA $2,000.00 $20,000.00 $500.00 $5,000.00 $500.00 $5,000.00
<br />15 Relocate Existing Pedestrian
<br />Push Button to New Post per
<br />Section 701
<br />12 EA $5,000.00 $60,000.00 $4,000.00 $48,000.00 $4,000.00 $48,000.00
<br />16 Install Pull Box per Section 701
<br />(Allowance)
<br />4 EA $1,000.00 $4,000.00 $1,000.00 $4,000.00 $1,000.00 $4,000.00
<br />17 Install Conduit per Section 701 20 LF $100.00 $2,000.00 $50.00 $1,000.00 $50.00 $1,000.00
<br />TOTAL BASE BID:
<br />REQUIRED DOCUMENTATION:
<br />Agreement to be Bound
<br />SUBCONTRACTORS:
<br />NOTES:
<br />Date:4/20/2023
<br />Mohit Chaudhary, Project Manager
<br />Date:-
<br />Austine Osakwe, Senior Engineer
<br />ITEM COST
<br />$1,051,500.00
<br />ENGINEER'S ESTIMATE
<br />ITEM COST
<br />Reviewed by:
<br />Reviewed by:
<br />Gremelli Industries
<br />25 % Participation
<br />Good Faith Effort
<br />YES
<br />$1,034,000.00
<br />NO
<br />TO BE SUBMITTED
<br />PROJECT TITLE:
<br />PROJECT NO.:
<br />BID NO.:
<br />QUANTITY
<br />Curb Ramp Upgrades for
<br />$893,400.00
<br />Gremelli Industries
<br />2022.0070
<br />22-23.007
<br />YES
<br />NO
<br />NO
<br />YES
<br />YES
<br />YES
<br />Bid Bond
<br />San Leandro Local Business
<br />Addendum #1
<br />NO
<br />YES
<br />NO
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that such
<br />bid has been found to be responsive or accepted as complete by the City. An
<br />award of contract, if any, is subject to approval of the City Council and/or the City
<br />Manager. Contractors should refer to the contract documents for bidding
<br />information.
<br />Annual Street Seal 2021-23
<br />Prepared by: Mohit Chaudhary
<br />Date Approved: 3/17/23
<br />Curb Ramp Upgrades for Street Seal 2021-23-04.20.23 Page 1 of 1 Printed 4/20/2023 @ 1:47 PM
|