My WebLink
|
Help
|
About
|
Sign Out
Home
10F ATS Review
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230620
>
10F ATS Review
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:53:11 PM
Creation date
6/23/2023 3:33:48 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/20/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID SUMMARY <br />BID OPENING Pavement Coatings Co.American Pavement Systems Inc. <br />DATE: May 18, 2023 2150 Bell Ave., Suite 125 1012 11th St., Suite 1000 <br />TIME: 3:00 p.m.Sacramento, CA 95838 Modesto, CA 95354 <br />LOCATION: City Clerk's Office Phone: (916) 642-1751 Phone: (209) 522-2277 <br />Fax: (916) 313-3438 Fax: (209) 408-0427 <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST <br />2022.0050 <br />22-23.010 <br />ITEM COSTQUANTITYITEM COST <br />PROJECT TITLE:Surface Seal Phase Annual Street Paving 21-23 <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />Prepared by: Mark Goralka <br />Date Approved:M 5/19/23 <br />TOTAL BID ALTERNATE A:$524,176.00 $824,466.40 $908,180.77 <br />TOTAL BASE BID: <br />TOTAL BASE BID + ALTERNATE BID ITEM A: <br />REQUIRED DOCUMENTATION: <br />Agreement to be Bound <br />SUBCONTRACTORS: <br />Reviewed by:Date: <br />Mark Goralka, Project Manager <br />Reviewed by:Date: <br />Austine Osakwe, Senior Engineer <br />Chrisp Company Graham Contractors, Inc. <br />Columbia Electric, Inc. <br />Santa Maria Concrete <br />YES YES <br />San Leandro Local Business N/A N/A <br />$10,106,802.00 <br />Bid Bond <br />$7,639,420.75 $9,207,612.65 <br />$7,115,244.75 $9,198,621.23$8,383,146.25 <br />N/A N/A <br />Good Faith Effort N/A N/A <br />25 % Participation <br />Addendum #1 YES YES <br />YES YES <br />C.F. Archibald Paving, Inc. <br />Reliable Tree Experts <br />FBD Vanguard Construction <br />Columbia Electric <br />Chrisp Company <br />C.F. Archibald <br />Surface Seal Phase Annual Street Paving 21-23 Page 5 of 5 Printed 5/19/2023 @ 9:49 AM <br />5/19/2023 <br />5/20/2023
The URL can be used to link to this page
Your browser does not support the video tag.