Laserfiche WebLink
BID SUMMARY <br />BID OPENING Basset Engineering D'Arcy & Harty Constructors, Inc.Marinship Development Int.,LLC <br />DATE: Thursday, June 1, 2023 2330 Castro Street 1300 Carroll Avenue 2100 Embarcadero, Suite 205 <br />TIME: 3:00 p.m.San Francisco, CA 94131 San Francisco, CA 94124 Oakland, CA 94606 <br />LOCATION: City Clerk's Office Phone: (415) 930-2385 Phone: (415) 822-5200 Phone: (415) 716-3965 <br />Fax: N/A Fax: (415) 822-0747 Fax: N/A <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST ITEM COSTQUANTITYITEM COST ITEM COST <br />PROJECT TITLE:Sanitary Sewer Point Repairs 2022 and <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />2022.0120 <br />22-23.013 <br />Prepared by: Robert Magno <br />Date Approved: 5/4/2023 <br />Wicks Boulevard Vault Cover Replacement <br />12 Point Repair, 12-inch Pipeline <br />Replacement, per section 306-7 <br />18 LF $170.00 $3,060.00 $1,000.00 $18,000.00 $140.00 $2,520.00 $154.00 $2,772.00 <br />13 Reconnect Service Lateral to 6-inch <br />Main Pipeline, per section 306-7 <br />29 EA $200.00 $5,800.00 $600.00 $17,400.00 $500.00 $14,500.00 $1,500.00 $43,500.00 <br />14 Install New Type A-2 Manhole, 0’-5’ <br />Depth, per section 306-7 <br />23 EA $8,000.00 $184,000.00 $11,000.00 $253,000.00 $7,000.00 $161,000.00 $9,000.00 $207,000.00 <br />15 Install New Type A-2 Manhole, 5’-10’ <br />Depth, per section 306-7 <br />10 EA $10,000.00 $100,000.00 $11,400.00 $114,000.00 $12,500.00 $125,000.00 $12,000.00 $120,000.00 <br />16 Repair/Rehabilitate Manhole Bench <br />and Channel, per section 500-5.2 <br />4 EA $1,000.00 $4,000.00 $6,700.00 $26,800.00 $1,500.00 $6,000.00 $12,000.00 $48,000.00 <br />17 Expose and Raise Manhole Frame & <br />Cover to Grade, per section 300-1.6 <br />1 EA $2,000.00 $2,000.00 $145.00 $145.00 $2,000.00 $2,000.00 $6,000.00 $6,000.00 <br />18 Sheeting, Shoring & Bracing, per <br />section 306-4 <br />1 LS $50,000.00 $50,000.00 $20,000.00 $20,000.00 $84,000.00 $84,000.00 $80,000.00 $80,000.00 <br />19 AC Pavement Restoration 6-inch <br />Depth, per section 302-5 <br />6700 SF $22.00 $147,400.00 $10.00 $67,000.00 $14.00 $93,800.00 $20.00 $134,000.00 <br />TOTAL BASE BID:$1,011,063.00 $1,321,390.00 $1,239,757.00 $1,794,384.00 <br />SUPPLEMENT PROJECT BID <br />1S.Mobilization & Demobilization per <br />Section 9-3.4(Not to exceed 10% of <br />total contract for Wicks Vault Cover <br />Replacement) <br />1 LS $10,550.00 $10,550.00 $2,400.00 $2,400.00 $15,000.00 $15,000.00 $25,000.00 $25,000.00 <br />2S.Temporary Traffic Control per Section <br />600 and 601(Wicks Vault Cover <br />Replacement) <br />1 LS $25,000.00 $25,000.00 $2,600.00 $2,600.00 $30,000.00 $30,000.00 $10,000.00 $10,000.00 <br />3S.Concrete Removal per Section 300- <br />1(Wicks Vault Cover Replacement) <br />1 LS $5,000.00 $5,000.00 $2,100.00 $2,100.00 $30,000.00 $30,000.00 $12,000.00 $12,000.00 <br />4S.Concrete Slab Top and Collar with <br />Manhole Access per Section 303 & <br />Detail 1/5(Wicks Vault Cover <br />Replacement) <br />1 LS $44,000.00 $44,000.00 $10,000.00 $10,000.00 $30,000.00 $30,000.00 $50,000.00 $50,000.00 <br />Sanitary Sewer Point Repairs 2022_Wicks Blvd Vault Cover Replacement.xlsx Page 2 of 3 Printed 6/1/2023 @ 5:46 PM