BID SUMMARY
<br />BID OPENING Basset Engineering D'Arcy & Harty Constructors, Inc.Marinship Development Int.,LLC
<br />DATE: Thursday, June 1, 2023 2330 Castro Street 1300 Carroll Avenue 2100 Embarcadero, Suite 205
<br />TIME: 3:00 p.m.San Francisco, CA 94131 San Francisco, CA 94124 Oakland, CA 94606
<br />LOCATION: City Clerk's Office Phone: (415) 930-2385 Phone: (415) 822-5200 Phone: (415) 716-3965
<br />Fax: N/A Fax: (415) 822-0747 Fax: N/A
<br />ITEM
<br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST ITEM COSTQUANTITYITEM COST ITEM COST
<br />PROJECT TITLE:Sanitary Sewer Point Repairs 2022 and
<br />PROJECT NO.:
<br />BID NO.:
<br />ENGINEER'S ESTIMATE
<br />2022.0120
<br />22-23.013
<br />Prepared by: Robert Magno
<br />Date Approved: 5/4/2023
<br />Wicks Boulevard Vault Cover Replacement
<br />12 Point Repair, 12-inch Pipeline
<br />Replacement, per section 306-7
<br />18 LF $170.00 $3,060.00 $1,000.00 $18,000.00 $140.00 $2,520.00 $154.00 $2,772.00
<br />13 Reconnect Service Lateral to 6-inch
<br />Main Pipeline, per section 306-7
<br />29 EA $200.00 $5,800.00 $600.00 $17,400.00 $500.00 $14,500.00 $1,500.00 $43,500.00
<br />14 Install New Type A-2 Manhole, 0’-5’
<br />Depth, per section 306-7
<br />23 EA $8,000.00 $184,000.00 $11,000.00 $253,000.00 $7,000.00 $161,000.00 $9,000.00 $207,000.00
<br />15 Install New Type A-2 Manhole, 5’-10’
<br />Depth, per section 306-7
<br />10 EA $10,000.00 $100,000.00 $11,400.00 $114,000.00 $12,500.00 $125,000.00 $12,000.00 $120,000.00
<br />16 Repair/Rehabilitate Manhole Bench
<br />and Channel, per section 500-5.2
<br />4 EA $1,000.00 $4,000.00 $6,700.00 $26,800.00 $1,500.00 $6,000.00 $12,000.00 $48,000.00
<br />17 Expose and Raise Manhole Frame &
<br />Cover to Grade, per section 300-1.6
<br />1 EA $2,000.00 $2,000.00 $145.00 $145.00 $2,000.00 $2,000.00 $6,000.00 $6,000.00
<br />18 Sheeting, Shoring & Bracing, per
<br />section 306-4
<br />1 LS $50,000.00 $50,000.00 $20,000.00 $20,000.00 $84,000.00 $84,000.00 $80,000.00 $80,000.00
<br />19 AC Pavement Restoration 6-inch
<br />Depth, per section 302-5
<br />6700 SF $22.00 $147,400.00 $10.00 $67,000.00 $14.00 $93,800.00 $20.00 $134,000.00
<br />TOTAL BASE BID:$1,011,063.00 $1,321,390.00 $1,239,757.00 $1,794,384.00
<br />SUPPLEMENT PROJECT BID
<br />1S.Mobilization & Demobilization per
<br />Section 9-3.4(Not to exceed 10% of
<br />total contract for Wicks Vault Cover
<br />Replacement)
<br />1 LS $10,550.00 $10,550.00 $2,400.00 $2,400.00 $15,000.00 $15,000.00 $25,000.00 $25,000.00
<br />2S.Temporary Traffic Control per Section
<br />600 and 601(Wicks Vault Cover
<br />Replacement)
<br />1 LS $25,000.00 $25,000.00 $2,600.00 $2,600.00 $30,000.00 $30,000.00 $10,000.00 $10,000.00
<br />3S.Concrete Removal per Section 300-
<br />1(Wicks Vault Cover Replacement)
<br />1 LS $5,000.00 $5,000.00 $2,100.00 $2,100.00 $30,000.00 $30,000.00 $12,000.00 $12,000.00
<br />4S.Concrete Slab Top and Collar with
<br />Manhole Access per Section 303 &
<br />Detail 1/5(Wicks Vault Cover
<br />Replacement)
<br />1 LS $44,000.00 $44,000.00 $10,000.00 $10,000.00 $30,000.00 $30,000.00 $50,000.00 $50,000.00
<br />Sanitary Sewer Point Repairs 2022_Wicks Blvd Vault Cover Replacement.xlsx Page 2 of 3 Printed 6/1/2023 @ 5:46 PM
|