My WebLink
|
Help
|
About
|
Sign Out
Home
Whitewater West Industries LTD CSA 20230621
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Whitewater West Industries LTD CSA 20230621
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 5:12:40 PM
Creation date
7/11/2023 5:12:25 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/21/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Whitewater West Industries, Ltd for <br />Washington Manor Pool Renovation – Play Structure <br /> Exhibit A – Page 2 of 3 <br />Consultant shall provide all necessary testing for its supplied equipment, certify that the <br />equipment is compliant with the vendor’s product and applicable standards, provide basic <br />training to staff for the operation and maintenance of the play structure. <br /> <br />Task 6: Post-Commissioning <br />Consultant shall provide Operations and Maintenance manual and 12-month warranty upon the <br />acceptance of the installation. <br /> <br />Deliverables: <br />1) Play Structure – Aquaplay Custome Model AP150TB – RTP. <br />2) Ready-to-Play Beach Theme. <br />3) All required documentation for Permits – from City of San Leandro Community <br />Development Department – Building Section and/or Alameda County Department of <br />Health. <br />4) Piping, valves, fittings, filters, etc. to supply water from consultant’s supplied stub ups to <br />waterslides and interactives. <br />5) Signage information <br />6) Operations and Maintenance Manual <br />7) 12 month warranty effective from date of installation acceptance. <br /> <br />City to provide: <br />1) Local code requirements for the ride and installation. <br />2) Site plans in CAD/pdf format - Where applicable, final pool plan with deck elevations, <br />water levels, and pool wall cross sections <br />3) Demolition and off haul of existing play structure, cut anchors flush to pool floor & clear <br />all existing structures (excludes stub up). <br />4) Lay-down area for equipment pre-assembly and storage. <br />5) Will answer RFI’s as needed for design work. Answers will be limited to known <br />information, or field measured and be approximate. City will not be responsible for <br />additional survey or other work required. <br />6) Permits – City will submit permits and provide payment for permits required to complete <br />work. City will provide consultant comments or requests received from permitting <br />agency pertaining to play structure for resubmission as needed for permit approval. <br /> <br />Schedule: <br /> <br />Consultant shall deliver, install and commission play structure no later than April 1st, 2024 ; this <br />includes all outstanding records shall be provided by. <br /> <br /> <br />Penalties for Delays (Liquidated Damages) <br />Time is of the essence in this Agreement. By execution of the Agreement, the City and the <br />Contractor agree that it will be difficult or impossible to determine the actual damage that the <br />City will sustain in the event of the Contractor’s failure to fully perform the work or to fully <br />perform all of the Contractor’s obligations that have accrued pursuant to the agreement by the <br />DocuSign Envelope ID: DC67CF15-DE43-49BE-AE02-90EF4C9C2A1F
The URL can be used to link to this page
Your browser does not support the video tag.