My WebLink
|
Help
|
About
|
Sign Out
Home
Jakes Associates Inc. CSA 20230624
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Jakes Associates Inc. CSA 20230624
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 10:37:30 AM
Creation date
7/12/2023 10:37:18 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/24/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between <br />City of San Leandro and Jakes Associates Inc. for Project No. 2023.3400 Exhibit A – Page 1 of 1 <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br /> <br /> <br />Project Description: <br /> <br />City of San Leandro owns and operates the Washington Manor Park Aquatic Center located at 14900 <br />Zelma St., which has been scheduled for rehabilitation. The Tower and Slide will be rehabilitated as part of <br />the project. <br /> <br />Description of Work: <br /> <br />Consultant shall provide an onsite visual inspection of Tower and slide for structural integrity to provide the <br />city with a recommendations report in regards to the viability of the structure to last for a <br />significant period without a complete remove and replace. <br /> <br />Tasks: <br />The following are the anticipated tasks for this contract: <br />1. Site visit <br />2. Perform inspection of slide fiberglass, connections, and yokes and components that relate to <br />the structural integrity of waterslide structure. <br />3. Document the inspection with images of the structure. <br />4. Review existing documentation <br />5. Conduct correspondence with O&M as needed <br /> <br />Deliverables: <br />A stamped report of inspection findings and engineering conclusion, including discussions related to in- <br />place repair vs removal and replacement of slide and tower. <br /> <br />Schedule: <br /> <br />Report to be completed and submitted within 5 business days of inspection. <br /> <br /> <br />DocuSign Envelope ID: F1AB1E0D-FD04-4CA8-8E43-F2B8EA28A468
The URL can be used to link to this page
Your browser does not support the video tag.