My WebLink
|
Help
|
About
|
Sign Out
Home
10D Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230710 Special
>
10D Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:53:26 PM
Creation date
7/12/2023 11:18:20 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/10/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br />Compensation Schedule Reimbursable Expenses <br />Monthly Price Annual Amount Location/Description of <br />Area Special Instructions[1] <br /> $ 4,735.13 $ 789.19 <br />Maintenance work to be provided twice per month April-October and <br />once per month November-March in areas open to vehicular traffic. <br />Debris pickup in landscaped areas only.Trees to be trimmed as needed. <br />(See Shoreline Area Landscape Maps #1-4).In areas closed to vehicular <br />traffic provide weed abatemetn in turf areas every other month. <br />Civic Center <br />835-999 E. 14th Street <br />All turf and paved areas, including sidewalks, between Root Park and <br />Peralta Avenue, between E. 14th Street and Lafayette, includes parking lots <br />(north and south) and landscaping. These areas are clean-up, mowing, <br />turf edging, blowing, maintenance of shrubs, and includes weeding the <br />large pots in the plaza (and trimming perennials back 1/year). Work must <br />be done on Monday (mowing/edging/blowing) and Thursday (blowing, <br />clean-up) of each week. During leaf drop months, leaves should be <br />picked up twice per week. <br />Marina Community Center <br />15301 Wicks Blvd. <br />Victoria Circle <br />Both sides of Bancroft Ave <br />Heron Bay Maintenance of lawn area and shrubs around information kiosk to be <br />provided once per week. (See Heron Bay Maps #1-4). <br />Western terminus of Lewelling <br />Blvd./Bayfront Drive <br />Maintenance work to be provided once per week. Includes all exterior <br />landscaping (including the courtyard) and all paved areas. <br /> $ 8,400.00 Shoreline Area Maintenance <br /> $ 2,735.72 $ 16,414.33 <br /> $ 643.70 $ 3,862.19 <br /> $ 4,248.41 $ 25,490.48 <br /> $ 482.77 $ 2,896.65 Maintenance work to be provided once per week. <br /> $ 1,400.00 <br />Contract Year 2023-2024
The URL can be used to link to this page
Your browser does not support the video tag.