My WebLink
|
Help
|
About
|
Sign Out
Home
10F Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230710 Special
>
10F Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:13:44 AM
Creation date
7/12/2023 11:19:05 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/10/2023
Retention
PERM
Document Relationships
Reso 23-096 Rubicon Amendment No. 7
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
applied matches the needs of the plant material as closely as possible, while <br />adhering to any watering restrictions in place. Contractor may be required to <br />adjust the clocks as requested by the City. It is the Contractor's responsibility to <br />insure that the system is operating correctly and that there is adequate coverage. <br />Any failure on the part of the Contractor to reduce a water budget when <br />requested to do so by the City will result in withholding of payment to cover <br />excessive water bills for that particular area. All spray heads shall be kept cleaned <br />and adjusted to maximize coverage with limited to no overspray or run-off onto <br />hardscape. <br />All irrigation parts and materials which are damaged or broken shall be reported <br />to the City. Upon request, Contractor shall then submit in writing a written proposal <br />for repair and/or replacement. A City representative shall then determine if work <br />shall be done by Contractor or a City crew. Contractor is responsible for any <br />damage caused by Contractor. For any repair work performed by the City, which <br />is at fau lt by the Contractor, shall be charged against the Contractor's monthly <br />account (Contractor shall have opportunity to perform repairs, which meet the <br />City's irrigation standards, first). If the contractor agrees to perform extra irriga t ion <br />work it must be performed w ithin 48 hours of the request unless otherwise specified <br />by the City and agreed to by the contractor. If the work is not performed within <br />the agreed upon time frame the repair cost may be withheld from the monthly <br />payments. This work normally includes broken sprink lers, lateral lines and <br />occasionally mainlines. When lateral and mainline repairs are made, the City must <br />be given the opportunity to inspect the work before it is covered up. If the City is <br />not given the chance to inspect the work the con t ractor may have to uncover the <br />work so that it can be inspected. <br />Vdlves shall be kept well-adjusted to insure efficient operation of the irrigation <br />system . The Contractor shall also keep the controllers clean and free of insects and <br />dust, and shall make any necessary repairs or replacements. <br />No modifications may be made to the existing automatic irrigation system without <br />express approval of the City. Any changes so approved shall be noted by the <br />Contractor on a copy of the Irrigation Plan and submitted to the City within five <br />working days of the completion of the work. The Contractor is responsible for <br />manually changing a ll irrigation clock watering times. In the event of a drought <br />condition, including mandatory water rationing, the City shall have the authority to <br />modify the watering requirements described in these specifications. <br />Weed Control (Other than Turf) <br />All areas within the work sites are to be kept free of weeds and volunteer tree <br />growth. This includes but is not limited to, all bare dirt areas and any weed growth <br />within ground cover and shrub plantings. Pedestrian walkways and other <br />hardscaped areas are to be kept weed-free at all times. <br />RFP 55027 CITYWlDE TURF MAINTENANCE Page 58 of 63
The URL can be used to link to this page
Your browser does not support the video tag.