My WebLink
|
Help
|
About
|
Sign Out
Home
10F Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230710 Special
>
10F Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:13:44 AM
Creation date
7/12/2023 11:19:05 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/10/2023
Retention
PERM
Document Relationships
Reso 23-096 Rubicon Amendment No. 7
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
management program , PINS Advantage. Contractor shall comply with all <br />requirements provided by City related to the PINS Advantage program . <br />4.5 Remedies. (Renumbered -as originally stated) <br />4. Exhibit B of the Agreement entitled "Compensation Schedule & Reimbursable Expenses " is <br />hereby amended to include : <br />Monthly Annual Area Description of Special Instructions <br />Price Total Area <br />$188.00 $2,2 56 .00 Marina Unpaved trail No growth in the Rip Rap will be permissible over <br />Park along Marina 18 " tall (measured from ground /soil to top of <br />Park adjacent to weed/sucker etc .). Any growth over 18 " will need to <br />rip rap to the be physically cut and removed . If pesticide is used <br />north and south to treat this area at no time will the pesticide be <br />of the Par permitted to come in contact with the bay and no <br />Course pre-emergent is allowed in the Rip Rap. <br />entrance. (see Application of any pesticide in this area must be <br />map as completed by 6am and is only allowed M-F. <br />attached) Contractor is encouraged to apply pesticide during <br />low tide as long as that pesticide application is <br />completed by 6am M-F . <br />$327.80 $3 ,933.60 Floresta Park is located Contractor will no longer provide service at <br />Park on Monterey Bl McCartney Park (Sunnyside at Breed). Cost <br />south of Floresta represents the net increase cost of providing <br />Bl. The service service at the new location. <br />location is at the <br />front end of the Spraying in all areas bordered by the St. (west), <br />park from the school (north) the 1Oft fence (east) and houses on <br />fence on the south side. Spraying will only be conducted <br />Monterey east to when the City provides 7 day notification in <br />the fence for the conjunction with the school district spraying at the <br />large ball field site . <br />Mow/Edge/blow all areas between the hours of <br />9am and 2pm within the above mentioned <br />boundaries. <br />String trim along the base of the entire length of <br />the 1Oft tall fence where there is no mow strip to <br />keep a neat and clean appearance. Also string trim <br />in areas where fencing meets the ground. <br />Fertilizing /aerating schedules will be same as other <br />City Park sites. <br />Amendment No . 3 to <br />Non -Professional Services Agreement between City of San Leandro and <br />Rubicon Landscape Corporation for Citywide Turf Maintenance <br />7/01/2019 <br />Page 2 of 4
The URL can be used to link to this page
Your browser does not support the video tag.