Laserfiche WebLink
<br /> <br />EXECUTION VERSION <br /> Page 1 <br />CHARGING STATION MASTER SITE LICENSE AGREEMENT <br /> <br />This Charging Station Master Site License Agreement (“Agreement”) is entered into as of the [___] day of <br />[_______], 2023 (“Effective Date”) by and between the City of San Leandro, a California municipal corporation <br />(“City”), and the East Bay Community Energy Authority, a Joint Powers Authority (“EBCE”). City and EBCE are <br />individually referred to as “Party” and collectively as “Parties”. <br /> <br />1. Grant of License. City is the fee simple owner of certain real property(ies) identified in Exhibit A (each a <br />“Property” and collectively “Properties”). City grants to EBCE and its contractors and vendors for the Term of this <br />Agreement: (i) a non-exclusive, irrevocable and non-transferable, except as specifically set forth herein, license to <br />use and occupy a designated portion of each Property (each such portion of a Property shall be referred to herein as <br />a “Site”), including the designated parking spaces for charging electric vehicles (“Charging Stalls”), as such Site <br />and Charging Stalls shall be more particularly described for each Property in a Notice to Proceed as provided in <br />Section 3, below, issued pursuant to this Agreement; (ii) any necessary easements or rights for installation, <br />maintenance, operation, access and utilities, as described herein, for the Purpose (including, but not limited to, any <br />rights necessary for PG&E to interconnect the Charging Stalls); and (iii) the right for EBCE to issue a sublicense to <br />its contractors and vendors that is up to, but no more than, coextensive with the license that City grants to EBCE <br />herein. City shall not allow installation or use of direct current fast charging stations other than those of EBCE on <br />any Property included in Exhibit A during the Term of this Agreement; provided nothing herein shall preclude the <br />City from installing electrical vehicle charging stations that are not direct current fast charging stations. If, during <br />the Term, City desires to install additional direct current fast Charging Stations at a particular Property, then City <br />grants to EBCE a right of first refusal to design, develop, construct, install, operate and maintain such additional <br />direct current fast Charging Stations. Upon notice by City to EBCE, EBCE will have up to six (6) months to <br />determine if it will develop additional direct current fast Charging Stations at the Property. Should EBCE opt not to, <br />or fail to respond to the City’s notice within six (6) months, the City may pursue development of the additional direct <br />current fast Charging Stations with another third-party provider. City agrees that, although the license granted <br />pursuant to this Section 1 is non-exclusive, to the extent the use of the Site is within the City’s control, the City will <br />not allow uses of any Site during an applicable Operating Term which are non-compatible with the intent of this <br />Agreement. <br /> <br />2. Purpose. City agrees that each Site may be used by EBCE and its contractors and vendors for any lawful activity <br />in connection with the design, development, construction, installation, maintenance, repair, replacement, removal, <br />security, and operation of direct current fast chargers and ancillary items to fuel electric vehicles, including, without <br />limitation, electrical equipment, hardware, software, signage and all supporting equipment and structures (which <br />may include concrete pads and protective bollards) (collectively, a “Charging Station”), together with any other uses <br />permitted herein (“Purpose”), on the terms and conditions set forth in this Agreement. <br /> <br />3. Notice to Proceed. City and EBCE shall reasonably cooperate on the development of a preliminary project design <br />for each Property included in Exhibit A. The preliminary project design shall include the Site and number and <br />location of Charging Stalls and a single line diagram approved by PG&E. Once the preliminary project design is <br />agreed upon by City and EBCE, EBCE shall be responsible for submitting the design to the distribution utility <br />service supplier (presently PG&E) for review. To the extent the distribution utility service supplier provides <br />revisions to the preliminary project design, EBCE shall make such revisions and submit the revisions to City for <br />approval, not to be unreasonably withheld. EBCE shall be responsible for submitting any further revised project <br />design(s) to the distribution utility service supplier for approval. The City shall not be liable for any delays caused <br />by EBCE or PG&E and any such delays by PG&E shall not affect the Term of the Agreement, unless specified <br />otherwise herein, or the rights and responsibilities of the Parties under this Agreement. Upon agreement of a final <br />project design by the Parties, approved by PG&E, City and EBCE shall execute a Notice to Proceed for the respective <br />Property in the form of Attachment 1 (each a “Notice to Proceed”). The Notice to Proceed shall identify the Site, the <br />number and location of Charging Stalls, and Site Access Hours for such Property. The Construction Coordination <br />Schedule shall be added as an amendment to the Notice to Proceed for such Property. Upon execution, each Notice <br />to Proceed shall be incorporated herein by this reference. City’s City Manager, or City’s designee, and EBCE’s <br />Jessie Denver (Director), or other duly authorized designee of EBCE, are delegated authority to execute Notices to <br />Proceed, as well as any amendments to such Notices to Proceed, for each Property. The Parties intend for such <br />Notices to Proceed to be administerial and to not require City budget appropriation; therefore, without waiving City <br />Council approval where necessary, the Parties intend for such Notices to Proceed to be issued or amended without <br />6 <br />June <br />DocuSign Envelope ID: D2372BE9-D7E3-4E76-9BFF-E8B3CA2B606C