Laserfiche WebLink
Schedule Q REVISED 011317: 0KG <br /> <br /> 14 <br />ATTACHMENT 1 – NOTICE TO PROCEED FOR [PROPERTY #1] <br /> <br />[insert Property address] <br />I. Site Description <br /> <br />The Site shall include [add written description]. <br /> <br />[include map designating Site on Property and preliminary design drawings] <br /> <br />II. Charging Stall Description <br /> <br />[Example Only]: EBCE plans to install 10-150 kilowatt dual port direct current fast chargers (“DCFC”) in 20 <br />Charging Stalls at the Property. Each DCFC will be capable of powering 2 Charging Stalls. Please note, the <br />capacity of the DCFC equipment may change in the final project design. <br /> <br />Per State of California requirements, 2 of the Charging Stalls will comply with the Americans With Disabilities <br />Act (“ADA”). To accommodate the van accessible ADA requirements, and DCFC equipment requirements <br />generally based on final product selection, 2 additional parking spaces may be needed at the Property (for a <br />total of up to 24 parking spaces). <br /> <br />To accommodate the electrical load of 10 DCFCs at the Property, EBCE will bring in a new PG&E metering <br />service at a 2-megawatt maximum size. EBCE costs related to the new electrical service will be assumed by <br />EBCE. The electrical service that powers the Charging Stalls will be EBCE’s Renewable 100 electricity product <br />and EBCE will be responsible for the meter. City will not pay any costs associated with the electricity <br />consumption from this new meter. A new PG&E transformer will be installed by PG&E and EBCE will <br />coordinate with PG&E through their Service Planning process to confirm the location of the transformer. EBCE <br />will notify the City Representative about the required location of PG&E’s transformer. A 3000 Amp switchboard <br />would be in the southwest corner of the property as well. <br /> <br />Through a public procurement solicitation issued by EBCE, EBCE has selected a vendor to provide turnkey <br />services that includes final design, equipment, installation, load management system, ongoing maintenance <br />services, and back-office services (e.g., communications, user account management, billing, reporting, utility <br />interface application, etc.). The vendor will be under contract with EBCE and will: <br />• Install all associated wiring and conduit that enable the operation of the Charging Stalls <br />(following all applicable building codes, industry standards, and best practices) <br />• Install any additional lighting, if necessary, for the Charging Stations <br />• Be responsible for pouring the concrete pads on which the DCFCs will be installed and <br />designing and installing appropriate physical barriers (barrier posts, wheel stops) for <br />structural support and protection of the DCFCs <br />• Mount all equipment in front of the Charging Stalls and will take into consideration <br />accessibility to cables and plugs as well as connectivity to vehicles <br />• Be required to incorporate cable management systems in each Charging Stall to keep the <br />charging cables off the ground <br />• Ensure the installation of the DCFCs complies with ADA requirements <br />• Re-stripe the Charging Stalls as needed <br />• Provide all signage required in consultation with EBCE <br />• Procure DCFCs and incorporate load management systems <br />• Provide a credit card payment solution (i.e. kiosk) if the DCFCs procured do not have a <br />built-in credit card reader to ensure compliance with SB 454 <br />• Provide a Maintenance and Operations for inclusion to this Agreement (Exhibit B) <br /> <br />DocuSign Envelope ID: D2372BE9-D7E3-4E76-9BFF-E8B3CA2B606C