My WebLink
|
Help
|
About
|
Sign Out
Home
10F Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230717
>
10F Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:20:34 AM
Creation date
7/18/2023 10:39:14 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/17/2023
Retention
PERM
Document Relationships
Reso 23-103 Resolution T and S Intermodal - Belt Press Building
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2315 South Bascom Ave, 200 Campbell, CA 95008 <br />408.377.3099 f 408.377.2189 B-796683 <br />1 <br />May 26, 2023 <br />Larry Lazzarinni <br />14645 Highway 9 <br />Boulder Creek, CA 95006 <br />650.279.4120 <br />New Butler Building Secondary Framing and Accessories <br />Dear Mr. Collins <br />AM Star Construction, Inc. is pleased to submit this estimate to proceed with the Detailing <br />and components for your existing BUTLER® Building as per the plans and specifications <br />generated by our office and incorporated with AM Star General Terms and Conditions, <br />Home Improvement Contract Specifications, AM Star Estimating Notes, Metal Building <br />Manufacturer’s Association Common Industry Practices (most recent edition), BUTLER® <br />standard terms and conditions, BUTLER® Unit Price Report, estimating notes, and <br />proposal exhibits. This proposal will take precedence over any bid plans or specifications <br />provided and shall be incorporated into any purchase order or agreement signed. <br />BUTLER® Components must be released for fabrication within two weeks from <br />engineering completion to avoid any material price escalations. It is further understood and <br />agreed that in the event material, equipment, labor, or subcontract prices escalate past what <br />was used to make this estimate an equitable adjustment shall be made. This is a production <br />order and will not be clarified or put on production hold. The following complete scope of <br />work is included: <br />Construction Management, Engineering, Planning and Permits: T and M if Required <br />Butler Detailing as per Unit Summary $29,983.75 <br />Butler Component Fabrication $69,962.09 <br />Certified Butler Erection By Others <br />$99,945.85 <br />Project Notes: Detail Scheduling: to be determined at time of order entry. <br />All Permits, City Fees, Additional Freight, Special Inspections and Sales Tax are not included. <br />This estimate is valid for 10 days from the date of quotation and must be accepted by End Customer. <br />Price based on clear, compacted, flat site access to and 25’ around slab drivable with 2 wheel fork lift with <br />perimeter ramp, Dumpster provided by Owner, No Grading work included past +/- .1 ft or repair/cleaning of <br />landscaping or hardscape included. This quote does not include any field welding or field painting or touch up <br />per MBMA 4.2.4. Shop primer included is for transport only. Anchor bolts and correction of are not part of <br />this proposal and shall be verified by Owner prior to mobilization. Anchor Bolts part of foundation cost not <br />provided by Building Manufacturer. The unloading and storage of Building Materials shall be additional to
The URL can be used to link to this page
Your browser does not support the video tag.