My WebLink
|
Help
|
About
|
Sign Out
Home
12B Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230717
>
12B Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:53:56 PM
Creation date
7/18/2023 10:41:10 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/17/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DescriptionReferenceExplanationENGINEERING AND TRANSPORTATION DEPARTMENT 5 Park Facilities Development Impact Fees (2)SLMC §7-13-100 Park Land Acquisition Fee:SLAC §8.8.100 Single FamilySLMC §7-1-820$18,293Increase based on Shelter component of SF Bay Area CPI of 1.035 Multi-Family$15,988Increase based on Shelter component of SF Bay Area CPI of 1.035 Special Unit $7,995Increase based on Shelter component of SF Bay Area CPI of 1.035 Accessory Dwelling Unit (3)$6,929 maximum (No fee when <750 sq. ft.) Increase based on Shelter component of SF Bay Area CPI of 1.035 Park Improvement Fee: Single Family$3,1575% increase based on Engineering News Records Construction Cost Index base year 1967 Multi-Family$2,7605% increase based on Engineering News Records Construction Cost Index base year 1967 Special Unit $1,3805% increase based on Engineering News Records Construction Cost Index base year 1967 Accessory Dwelling Unit (3)$1,196 maximum (No fee when <750 sq. ft.)5% increase based on Engineering News Records Construction Cost Index base year 1967 Total Acquisition and Improvement Fee: Single Family$21,4500.08% Shelter component of SF Bay Area CPI & 4% based on Engineering News Records Construction Cost Index base year 1967 Multi-Family$18,7480.08% Shelter component of SF Bay Area CPI & 4% based on Engineering News Records Construction Cost Index base year 1967 Special Unit $9,3750.08% Shelter component of SF Bay Area CPI & 4% based on Engineering News Records Construction Cost Index base year 1967 Accessory Dwelling Unit (3)$8,125 maximum (No fee when <750 sq. ft.)0.08% Shelter component of SF Bay Area CPI & 4% based on Engineering News Records Construction Cost Index base year 19678 Overhead Utility ConversionA. Residential DevelopmentSLMC §5-3-325 Underground Utility District Master Planii) $1,861.59 per dwelling unit, or 5% increase based on Engineering News Records Construction Cost Indexiii) $465.82/LF of property frontage 5% increase based on Engineering News Records Construction Cost IndexB. Non-Residential Developmentii) $465.82/LF of property frontage 5% increase based on Engineering News Records Construction Cost Index(4)Technology Fee does not apply to the following fees: (1.C) Parklet Program, (1.I) News Rack Permits, (3) Building Permit review costs by Engineering staff, (4) Large Format Copies, (5) Park Facilities Development Impact Fees, (6.E) & (6.F) Grading Permit Performance and Erosion Control Bonds, and (8) Overhead Utility Conversion Fees.(3) Impact fee for ADUs 750 sq. ft. or larger shall be charged proportionately in relation to the size of the primary dwelling unit, per CA Gov't Code Section 65852.2.$7,833 maximum (No fee when <750 sq. ft.)Lesser of:i) Actual cost per linear foot of property frontage, orii) $1,774.00 per dwelling unit, oriii) $443.92/LF of property frontageLesser of:i) Actual cost per linear foot of property frontage, orii) $443.92/LF of property frontage (2) Park Development Fees created with Reso. 2000-64, and amended with Reso. 2005-069 & Reso. 2019-074.$9,038$15,444$7,723$6,693 maximum (No fee when <750 sq. ft.)$3,009$2,630$1,315$1,140 maximum (No fee when <750 sq. ft.)$20,679$18,074$17,670Current FeeProposed Fees
The URL can be used to link to this page
Your browser does not support the video tag.