Laserfiche WebLink
<br />Non-Professional Services Agreement between June 29, 2023 <br />City of San Leandro and Consolidated Engineering Laboratories <br />For Washington Ave Reconstruction Project Exhibit B Page 2 of 2 <br />The proposed unit rates will be in effect through June 30, 2024. Thereafter, the unit rates are subject to an <br />annual increase of five and one-half percent (5.5%) per year to mitigate the annual operating cost <br />increases: <br /> <br />Work over 8 Hours per day Time and One-Half <br />Work over 12 Hours, Monday through Friday Double Time <br />Work on Saturdays Time and One-Half <br />Work over 8 Hours on Saturdays Double Time <br />Work on Sundays/Holidays Double Time <br />Swing or Graveyard Shift Premium $12.50 per Hour <br />Work from 0-4 Hours 4-Hour Minimum Billing <br />Work from 4-8 Hours 8-Hour Minimum Billing <br />Show-Up Time 2-Hour Minimum Billing <br />Same-Day Service Call Requests $200.00/each <br />Sample Pick-Up $75.00/Trip <br />Laboratory Testing –Rush Fee Add 50% to <br />Testing Cost Technician with a Nuclear Gauge Portal-to-Portal <br />Final Affidavit-(per permit number) <br />(request six working days advanced notice) $500.00 <br />Extra Copies (over four per issue date) of Inspection Reports <br /> and Final Affidavit $20.00/each <br />Project Engineering and Management 10% of Fees <br />Credit Card Payment of Fees 2.5% Premium <br /> <br />Reimbursables Cost + 15% QA/QC Plan Written Procedures Quotation upon Request <br />Out of Area Services (beyond 40-mile radius) As Listed Below: <br /> Travel Time Basic Hourly Rate <br /> Mileage $0.625/Mile <br /> Per-Diem, including lodging $120.00/Day <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 37F757DF-5655-48CF-BF04-7BDD9722C0FA