My WebLink
|
Help
|
About
|
Sign Out
Home
Stormwater Agreement_07.24.2023
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2023
>
Stormwater Agreement_07.24.2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2023 3:31:31 PM
Creation date
7/26/2023 3:30:16 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/24/2023
Recorded Document Type
Stormwater Treatment
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Treatment and Detention Measures Maintenance and Monitoring Plan <br />This checklist identifies the inspection and maintenance to be conducted for the identified items <br />in the stormwater treatment system. Please refer to the included site map for the specific <br />locations of these items. <br />Property Information: <br />Property Address or APN: 1500 & 1600 Alvarado Street, San Leandro, CA <br />APN: 75-47-63, 75-47-62; 75-47-61; 75-47-60; 75-47-59; 75-47-58 <br />II. Stormwater Treatment Measure Information: <br />The following stormwater treatment measures (identified treatment measures) are located on the <br />property identified above: <br />Treatment <br />Type of Treatment Measure <br />Location of Treatment Measure on the Property <br />Measure <br />Bio-Retention <br />Filters runoff before release to city storm <br />Located throughout the site. <br />Areas <br />drain system. <br />Refer to the site map for treatment area locations. <br />Bio-Retention <br />Collects treated runoff from the bio- <br />Located below each bio-retention area. <br />Area Subdrain <br />retention areas. <br />Cleanouts are located at each end of the subdrain <br />Lines <br />line. <br />Refer to the site map for specific cleanout locations. <br />Overflow Basin <br />Collects overflow from bio-retention <br />Located in the bio-retention areas. <br />(CB) <br />areas. <br />Refer to the site map for specific locations. <br />Storm Drain Lines <br />Transports runoff from collection points <br />Located throughout the site. <br />(SD) <br />and treatment areas. <br />Refer to the site map for storm drain line locations. <br />Pervious Paver <br />Transports excess runoff from under the <br />Located under the pervious paver patio behind the <br />Area Sub -drain <br />pervious paver patio to the storm drain <br />medical building. <br />Lines <br />system. <br />Cleanouts are located at each end of the subdrain <br />line. <br />Refer to the site map for specific cleanout locations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.