Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and 12 July 2023 <br />Freyer & Laureta, Inc. Exhibit A – Page 16 of 21 <br />EXHIBIT A <br />On June 20, 2023, City awarded a construction contract to Basset Engineering for the work of Sanitary <br />Sewer Point Repairs 2022 and Wicks Boulevard Vault Cover Replacement Project. To provide the <br />construction administration support for the subject project, Freyer & Laureta, Inc., the design consultant will <br />provide the scope work related to the Wicks Boulevard Vault Cover Replacement part of worked with City <br />staff to design the Wicks Boulevard Vault Cover Replacement only and will provide Construction <br />Administration support for only this part of the project. <br /> Scope Work <br />The scope of work for this contract is limited to the Wicks Boulevard Vault Cover Replacement portion of <br />the project and includes: <br /> <br />• Provide interpretation of contract documents to address contractor’s Requests for Information, <br /> review shop drawings <br />and other contractor submittals. <br /> <br />• Coordinate AutoCAD file transfer to Contractor if requested and as directed by the City. <br /> <br />• Provide consultation and prepare drawings as needed to address and resolve conflicts during <br />construction. <br /> <br />• Prepare Record Drawings at the end of the project. <br /> <br />• Attend meetings with the Contractor, as requested by the City. <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 64418B75-9E7F-4AD6-B7AB-C78127EB9254