Laserfiche WebLink
<br />Notice of Award 6/21/23 Page 4 Agreement <br />Surface Seal Phase for Paving 2021-23 Project No. 2022.0050 <br /> <br /> <br />CONTRACT PRICE SCHEDULE – BASE BID <br />Item <br />No. Description <br />Estimated <br />Quantity <br />(A) <br />Unit of <br />Measure <br />Item UNIT Price <br />(in Words) <br />Item UNIT <br />Price (B) <br />(in Figures) <br />TOTAL PRICE <br />(AxB) <br />(in Figures) <br />1 Mobilization and General <br />Conditions per Section 9-3.4 LS 1 <br />Five Hundred and Fifty Thousand <br />Dollars and Zero Cents <br /> <br />$550,000.00 <br /> <br />$550,000.00 <br />2 Construction Surveying per <br />Section 2-9 LS 1 <br />Twenty Thousand Dollars and <br />Zero Cents <br /> <br />$20,000.00 $20,000.00 <br />3 Clearing and Grubbing per <br />Section 300-1 LS 1 Fifty Thousand Dollars and Zero <br />Cents <br />$50,000.00 $50,000.00 <br />4 Water Pollution Control per <br />Section 7-8.6 LS 1 Twenty Five Thousand Dollars <br />and Zero Cents <br />$25,000.00 $25,000.00 <br />5 Traffic and Pedestrian Control, <br />Temporary Signage per Section <br />600 <br />LS 1 <br />Seven Hundred and Sixteen <br />Thousand Dollars and Zero Cents <br />$716,000.00 $716,000.00 <br />6 Potholing per Sections 5-1 and <br />306-0 LS 1 Sixty Thousand Dollars and Zero <br />Cents <br />$60,000.00 $60,000.00 <br />7 Remove Thermoplastic <br />Markings, Striping, Lane <br />Markers, and Striping <br />Delineators per Sections 300-1.3, <br />314-2, and 314-3 <br />LS 1 <br />Two Hundred and Ninety Eight <br />Thousand Dollars and Zero Cents <br />$298,000.00 $298,000.00 <br />8 Remove Obstructions from <br />Driveways per Section 300-1.3 EA <br />Not Used <br /> <br />Not Used <br /> <br />Not Used <br />9 Adjust Utility Manhole Frame & <br />Cover to Finish Grade per <br />Section 301-1.6 <br />EA 268 <br />One Thousand Five Hundred <br />Dollars and Zero Cents <br />$1,500.00 $402,000.00 <br /> <br />10 Adjust Unknown Cover Frame & <br />Cover to Finish Grade per <br />Section 301-1.6 <br />EA 7 <br />Two Thousand Dollars and Zero <br />Cents <br /> <br />$2,000.00 $14,000.00 <br /> <br />11 Adjust Water Valve Box to <br />Finish Grade per Section 301-1.6 EA 322 One Thousand Two Hundred <br />Dollars and Zero Cents <br />$1,200.00 $386,400.00 <br /> <br />12 Adjust Gas Valve Box to Finish <br />Grade per Section 301-1.6 EA 16 One Thousand Two Hundred <br />Dollars and Zero Cents <br />$1,200.00 $19,200.00 <br /> <br />13 Adjust Survey Monument Box to <br />Finish Grade per Section 301-1.6 EA 83 One Thousand Two Hundred <br />Dollars and Zero Cents <br />$1,200.00 $99,600.00 <br /> <br />14 Adjust Detector Handhole Frame <br />& Cover to Finish Grade per <br />Section 301-1.6 <br />EA 15 <br />Eight Hundred Dollars and Zero <br />Cents <br />$800.00 $12,000.00 <br /> <br />15 Adjust Sanitary Sewer Lamphole <br />Frame & Cover to Finish Grade <br />per Section 301-1.6 <br />EA 14 <br />One Thousand Five Hundred <br />Dollars and Zero Cents <br />$1,500.00 $21,000.00 <br /> <br />16 Adjust Traffic Signal Box Frame <br />& Cover to Finish Grade per <br />Section 301-1.6 <br />EA 1 <br />Six Hundred and Seventy Five <br />Dollars and Zero Cents <br />$675.00 $675.00 <br /> <br />17 Remove and Replace Concrete <br />Curb and Gutter per Sections <br />300-1.3 and 303-5 <br />LF 794 <br />One Hundred and Thirty Five <br />Dollars and Zero Cents <br />$135.00 $107,190.00 <br /> <br />18 Remove and Replace Concrete <br />Rolled Curb and Gutter per <br />Sections 300-1.3 and 303-5 <br />LF 187 <br />Two Hundred and Eighty Dollars <br />and Zero Cents <br />$280.00 $52,360.00 <br /> <br />DocuSign Envelope ID: BF382849-3F16-4358-96E7-72CAC7F22144