My WebLink
|
Help
|
About
|
Sign Out
Home
FinalMinutes 2020 0420 Regular Meeting
CityHall
>
City Clerk
>
City Council
>
Minutes
>
2020
>
FinalMinutes 2020 0420 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 5:06:27 PM
Creation date
8/9/2023 5:06:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minutes
Document Date (6)
4/20/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 20, 2020City Council Minutes <br />Approve a Consulting Services Agreement with Lee & Ro for the Design <br />of the Secondary Effluent Line Replacement and Davis Street Manhole <br />Replacement Project, Project No. 2018.6000 for an Amount Not to <br />Exceed $361,998; to Authorize Individual Agreement Amendments up to <br />10% ($36,200); and to Authorize Cumulative Agreement Amendments <br />up to 15% ($54,300) <br />Received and Filed on the Consent Calendar. <br />20-110 RESOLUTION of the City of San Leandro City Council to Approve a <br />Consulting Services Agreement with Lee & Ro for the Design of the <br />Secondary Effluent Line Replacement and Davis Street Manhole <br />Replacement Project, Project No. 2018.6000 for an Amount not to <br />Exceed $361,998; to Authorize Individual Agreement Amendments up to <br />10% (36,200) and to Authorize Cumulative Agreement Amendments up <br />to 15% ($54,300) (provides authorization for the City Manager to enter <br />into an agreement with Lee & Ro to prepare the surveys and engineering <br />designs for the Secondary Effluent Line Replacement and Davis Street <br />Manhole Replacement Project) <br />Adopted on the Consent Calendar. <br />Enactment No: Reso 2020-035 <br />8.D.20-124 Staff Report for a City of San Leandro City Council Resolution to <br />Approve a Cooperative Agreement with Alameda County Flood Control <br />and Water Conservation District for Improvements to the Estudillo Canal <br />and the Monarch Bay Drive Bridge <br />Received and Filed on the Consent Calendar. <br />20-125 RESOLUTION of the City of San Leandro City Council to Approve a <br />Cooperative Agreement with Alameda County Flood Control and Water <br />Conservation District for Improvements to the Estudillo Canal and the <br />Monarch Bay Drive Bridge (provides for modification of the Estudillo <br />Canal to reduce the risk of flooding and maintenance work on the <br />Monarch Bay Drive Bridge) <br />Adopted on the Consent Calendar. <br />Enactment No: Reso 2020-036 <br />Items 8.E. was removed from the Consent Calendar to Item 9, Items Removed From <br />Consent Calendar <br />8.F.20-100 Staff Report for a City of San Leandro City Council Resolution for the <br />Approval of Fiscal Year 2021 Proposed Projects Paid from the State’s <br />Road Maintenance and Rehabilitation Account to City's Gas Tax Fund <br />(140-31-057) for Streets Maintenance <br />Page 3City of San Leandro
The URL can be used to link to this page
Your browser does not support the video tag.