Laserfiche WebLink
DescriptionCurrent FeeReferenceCOMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued)ii) Investigation Feesa) Investigation fee for work commenced without first obtaining permits as required by the San Leandro Municipal Code, whether or not a permit is subsequently issued b) Investigation fee for conditions that are not in compliance with the San Leandro Zoning and/or Municipal Codes Note: Payment of any investigation fees does not exempt any person from compliance with all other provisions of applicable codes in the execution of the work nor from any other penalties prescribed by law. (1)(2)E. Other Fees and Charges (i) Technology Fee (ii) Community Planning Fee (for commercial, industrial & residential projects) 0.3% of total valuation of construction (iii) Strong Motion Impact Fee: State mandated tax for the Seismic Safety Commission for seismic monitoring. -- Residential0.00013 per $1.00 Valuation or fraction thereof with a $0.50 -- Commercial/Industrial0.00028 per $1.00 Valuation or fraction thereof with a $0.50 (iv) Building Standards Commission (SB1473) Fee: State Mandated tax for Green Building Standards collected for the State by the City.All Residential, Commercial, and Industrial permits that use Valuation to determine permit fees: $1.00 per $25,000 valuation or fraction thereof with a $1.00 minimum. (v) Exception to Noise Ordinance $491 (vi) Certificate of Occupancy (vii) Temporary Certificate of Occupancy per 30 days (viii) Certificate of Compliance: (ix) House Moving Permit (x) Microfilm Copies (xi) Photocopies (xii) Microfilming of Permit and Plans includes imaging fee for fire permits: (For purposes of fee charges, each permit is considered a drawing) -- 8-1/2 x 11 or 11 x 14 drawings including fire permits -- All other size drawings (xiii) Appeals(1) Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs(2)(3) Administrative CitationsBuilding Code Violation- First Violation$130CA Gov’t Code 36900- Second Violation$700CA Gov’t Code 36900- Third Violation$1,300CA Gov’t Code 36900Each additional violation of the same ordinance within two years of the first violation $2,500CA Gov’t Code 36900$209 per hour; 1 hour minimum charge$209 per hour; 1 hour minimum charge$0.10 per page $209 per hour; 1 hour minimum charge$209 per hour; 1 hour minimum charge$1.20$2.10 per sheet$1.90 per sheetNote: For small tenant improvements to existing buildings and ADUs, the Chief Building Official and/or the Community Development Director may waive the Community Planning Fee at his/her discretion.$209 per hour; 1 hour minimum charge6% of permit fee, minimum $7.29 per permit typeCommunity Planning Fee will not be charged for the following project types: permits for accessory dwelling units; stand-alone mechanical, plumbing, and electrical permits; minor residential remodels, and; minor tenant improvements. Direct Costs (1)Community Planning Fee will not be charged for the following project types: permits for accessory dwelling units; stand-alone mechanical, plumbing, and electrical permits; minor residential remodels, and; minor tenant improvements.EXHIBIT ADocuSign Envelope ID: C06F5183-C6CA-48E2-AC7D-882CAEC2E603