Laserfiche WebLink
DescriptionReferenceCurrent FeeENGINEERING AND TRANSPORTATION DEPARTMENT (continued) 5 Park Facilities Development Impact Fees (2)SLMC §7-13-100 Park Land Acquisition Fee:SLAC §8.8.100 Single FamilySLMC §7-1-820 Multi-Family Special Unit Accessory Dwelling Unit (3) Park Improvement Fee: Single Family Multi-Family Special Unit Accessory Dwelling Unit (3) Total Acquisition and Improvement Fee: Single Family Multi-Family Special Unit Accessory Dwelling Unit (3)ENGINEERING AND TRANSPORTATION DEPARTMENT (continued) 6 Grading Permits:SLMC §7-12-200A. PermitB. InspectionC. Inspection DepositD. Plan ReviewE. Performance BondSLMC §7-12-605F. Erosion and Sediment Control BondSLMC §7-12-6107 Public Works Projects:A. City Standard Plans (Printed or CD)B. Bidder: City Projects Plans & Specification Documents purchased at City HallC. Bidder: City Project Plans & Specification Documents purchased via mailENGINEERING AND TRANSPORTATION DEPARTMENT (continued) 8 Overhead Utility ConversionA. Residential DevelopmentSLMC §5-3-325 Underground Utility B. Non-Residential Development9 City Property Use Application Fee10 Technology Fee (4)(4)$65 $6,693 maximum (No fee when <750 sq. ft.)$3,009$2,630$1,315$20,679$18,074$9,038$7,833 maximum (No fee when <750 sq. ft.)$1,140 maximum (No fee when <750 sq. ft.)$17,670$15,444$7,723As determined by City EngineerEstimated cost for erosion and sediment control$10.00 Direct Costs (rounded to nearest $5) or a minimum of $25.00$136.00/hourAs determined by City EngineerPlan Check Engineer=$166.00/hr; Sr. Engineer=$203.00/hrPrincipal Engineer=$224.00/hrii) $1,774.06 per dwelling unit, oriii) $443.92.00/LF of property frontageLesser of:i) Actual cost per linear foot of property frontage, orii) $443.92/LF of property frontage Direct Costs (1)Direct Costs (rounded to nearest $5) or a minimum of $25.00 + mailing costsLesser of:i) Actual cost per linear foot of property frontage, or6% of application fee and deposit; $3.90 minimum(1) Direct Costs: Hourly personnel charge plus a factor of 33% for benefits, 54% for indirect overhead charges and 87% for staff support charges.(2) Park Development Fees created with Reso. 2000-64, and amended with Reso. 2005-069 & Reso. 2019-074.(3) Impact fee for ADUs 750 sq. ft. or larger shall be charged proportionately in relation to the size of the primary dwelling unit, per CA Gov't Code Section 65852.2.Technology Fee does not apply to the following fees: (1.C) Parklet Program, (1.I) News Rack Permits, (3) Building Permit review costs by Engineering staff, (4) Large Format Copies, (5) Park EXHIBIT ADocuSign Envelope ID: C06F5183-C6CA-48E2-AC7D-882CAEC2E603