Laserfiche WebLink
DescriptionCurrent FeeReferenceCOMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued)B. Permit Fee (continued) iii) Stand-Alone Electrical PermitUp to $2,000$105 $2,001 to $5,000$209 $5,001 to $10,000$209 for the first $5,000 plus $41.83 for each add'l $1,000 or fraction thereof, to and including $10,000 $10,001 and up$418 for the first $10,000 plus $13.94 for each additional $1,000 or fraction thereof over $10,000 iv) Stand-Alone Mechanical Permit Up to $2,000$105 $2,001 to $5,000$209 $5,001 to $10,000$209 for the first $5,000 plus $41.83 for each add'l $1,000 or fraction thereof, to and including $10,000 $10,001 and up$418 for the first $10,000 plus $13.94 for each additional $1,000 or fraction thereof over $10,000 v) Residential 1 and 2 Family Re-roof a) Main dwelling roof$292 all sizes and materials b) Detached garages and accessory structures on same property as main dwelling and done at the same time as the main dwelling roof.$93 vi) Inspection of the installation of an earthquake gas shutoff valve $35 with no Filing & Issuance Feevii) Residential Seismic Retrofit projects using "Plan set A" (for one and two family residences) $81 plus Filing and Issuance Fee and other miscellaneous feesviii) Photovoltaic Systemsa) Residentiali) Up to 15kW$314 ii) each additional kW over 15kW $16 b) Commerciali) Up to 25kW$438 ii) 26kW - 50kW$658 iii) each additional kW (51kW - 250kW) $7 iv) each additional kW over 250kW $5 Note: For photovoltaic systems, total permit fees, including applicable Permit Issuance and Filing Fees, Automation Fees, Community Planning Fees, and other mandated fees shall not exceed amounts authorized via Government Code Section 66015.EXHIBIT ADocuSign Envelope ID: C06F5183-C6CA-48E2-AC7D-882CAEC2E603