Laserfiche WebLink
<br /> <br />Consulting Services Agreement between City of San Leandro and August 24, 2023 <br />BSK for Annual Paving 2021-23 Exhibit A – Page 2 of 2 <br /> <br /> <br />Item Task Description Method Frequency <br />Concrete Sampling and Testing <br />3.1 Field sampling of concrete materials By Field Technician Days (4) <br />EA <br />3.2 Concrete sample pickup / transportation to material laboratory By Field Technician 2 EA <br />3.3 Concrete compressive strength testing ASTM C39 8 EA <br />Project Management and Administration <br />4.1 Review of material submittals for compliance with project specifications Per project <br />4.2 Final summary report of field observations/procedures and test results. Per project <br />4.3 Project Management Per Project <br />Allowance <br />5.1 Contingency for additional testing or services, such and ac compaction <br />testing or additional testing and observation based on unanticipated site <br />conditions. <br />TBD TBD <br /> <br />Schedule: <br />The City has entered into a contract with Pavement Coatings Company for construction of the Surface Seal for <br />Annual Paving 2021-23 project. Work is scheduled to start in August 2023 with most of the work anticipated <br />to be complete in October 2023. Some portions of the work , however, may be completed after winter in <br />Spring 2024. BSK shall provide testing and observation services for this work as needed based on the <br />construction schedule and activities being performed by the City’s contractor. A minimum of twenty four <br />(24) hours advance notice will be provided for all field observation and sampling activities. <br /> <br />DocuSign Envelope ID: 7B75AD26-9318-40AB-955F-C0CC3601BA95