My WebLink
|
Help
|
About
|
Sign Out
Home
BSK Associates CSA 20230824
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
BSK Associates CSA 20230824
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2023 3:48:22 PM
Creation date
9/19/2023 3:48:13 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
8/24/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Consulting Services Agreement between City of San Leandro and August 24, 2023 <br />BSK for Annual Paving 2021-23 Exhibit A – Page 2 of 2 <br /> <br /> <br />Item Task Description Method Frequency <br />Concrete Sampling and Testing <br />3.1 Field sampling of concrete materials By Field Technician Days (4) <br />EA <br />3.2 Concrete sample pickup / transportation to material laboratory By Field Technician 2 EA <br />3.3 Concrete compressive strength testing ASTM C39 8 EA <br />Project Management and Administration <br />4.1 Review of material submittals for compliance with project specifications Per project <br />4.2 Final summary report of field observations/procedures and test results. Per project <br />4.3 Project Management Per Project <br />Allowance <br />5.1 Contingency for additional testing or services, such and ac compaction <br />testing or additional testing and observation based on unanticipated site <br />conditions. <br />TBD TBD <br /> <br />Schedule: <br />The City has entered into a contract with Pavement Coatings Company for construction of the Surface Seal for <br />Annual Paving 2021-23 project. Work is scheduled to start in August 2023 with most of the work anticipated <br />to be complete in October 2023. Some portions of the work , however, may be completed after winter in <br />Spring 2024. BSK shall provide testing and observation services for this work as needed based on the <br />construction schedule and activities being performed by the City’s contractor. A minimum of twenty four <br />(24) hours advance notice will be provided for all field observation and sampling activities. <br /> <br />DocuSign Envelope ID: 7B75AD26-9318-40AB-955F-C0CC3601BA95
The URL can be used to link to this page
Your browser does not support the video tag.