My WebLink
|
Help
|
About
|
Sign Out
Home
T&S Intermodal Maintenance, Inc. NPSA 20230901
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
T&S Intermodal Maintenance, Inc. NPSA 20230901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2023 3:49:11 PM
Creation date
9/19/2023 3:49:02 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/1/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work Order Title: <br />Work Order Number:119374.00 <br />San Leandro Breakroom flood repair <br />Section - 26 <br />26 05 33 23 0393 Blank Device Cover Plate (Wiremold #AL5246B)58 $161.03EA <br />Installation =x x 143.78 <br />FactorUnit PriceQuantity Total <br /> 21.26 1.3526 5.00 <br />Demolition x x = 17.25 2.55 1.3526 5.00 <br />r/r cover plates <br />26 27 26 00 0007 20 Amperes, 2 Gang, NEMA 5-20, Duplex Receptacle Assembly59 $2,416.58EA <br />Installation =x x 1,717.44 <br />FactorUnit PriceQuantity Total <br /> 115.43 1.3526 11.00 <br />Demolition x x = 699.15 46.99 1.3526 11.00 <br />9ea outlets and 1ea quad outlet = 11ea <br />26 27 26 00 0138 1 Gang, 20 Amperes, 120/277 Volt, SPST, Switch Assembly60 $1,023.95EA <br />Installation =x x 736.98 <br />FactorUnit PriceQuantity Total <br /> 90.81 1.3526 6.00 <br />Demolition x x = 286.97 35.36 1.3526 6.00 <br />2ea- singles, 2ea- doubles= 6ea <br />$3,787.73Subtotal for Section - 26 <br />Proposal Total <br />This total represents the correct total for the proposal. Any discrepancy between line totals, <br />sub-totals and the proposal total is due to rounding. <br />$64,399.48 <br />The Percentage of NPP on this Proposal:% <br />Page 7 of 7 <br />8/22/2023 <br />Contractor's Price Proposal - Detail <br />DocuSign Envelope ID: B5203E1B-8956-48C2-A293-62D9BF8B3380
The URL can be used to link to this page
Your browser does not support the video tag.