My WebLink
|
Help
|
About
|
Sign Out
Home
5G Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230918
>
5G Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:55:01 PM
Creation date
9/19/2023 5:43:02 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/18/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - MITIGATION MONITORING PROGRAM <br />June 2023 C-21 SF Bay Fiber Optic Cables Project <br /> <br /> <br /> <br />1 1.4.7 HYDROLOGY AND WATER QUALITY <br /> <br />2 <br />3 <br /> <br />4 MM HYD-1: Develop and Implement Stormwater Pollution Prevention Plan. <br />5 Bandwidth shall develop and implement a Stormwater Pollution Prevention Plan <br />6 (SWPPP) consistent with the Statewide NPDES Construction General Permit <br />7 (Order 2009-0009-DWQ). At a minimum, the SWPPP shall include measures for: <br /> <br />8 • Maintaining adequate soil moisture to prevent excessive fugitive dust <br />9 emissions, preservation of existing vegetation, and effective soil cover <br />10 (e.g., geotextiles, straw mulch, hydroseeding) for inactive areas and <br />11 finished slopes to prevent sediments from being dislodged by wind, rain, or <br />12 flowing water. <br />13 • Installing fiber rolls and sediment basins to capture and remove particles <br />14 that have already been dislodged. <br />15 • Establishing good housekeeping measures such as construction vehicle <br />16 storage and maintenance, handling procedures for hazardous materials, <br />17 and waste management BMPs, including procedural and structural <br />18 measures to prevent the release of wastes and materials used at the site. <br /> <br />19 The SWPPP shall also detail spill prevention and control measures to identify the <br />20 proper storage and handling techniques of fuels and lubricants, and the <br />21 procedures to follow in the event of a spill. The SWPPP shall be provided to CSLC <br />22 staff a minimum of 30 days prior to Project implementation. <br /> <br />23 Location: Terrestrial Project areas <br />24 Monitoring/Reporting Action: Develop SWPPP and provide to CSLC 30 days prior <br />25 to Project implementation. <br />26 Effectiveness Criteria: Implementation of this MM will reduce the Project impacts <br />27 on hydrology and water quality. <br />28 Responsible Party: Applicant and CSLC <br />29 Timing: During construction <br />Potential Impact: Hydrology and Water Quality – Impacts on hydrology and <br />water quality
The URL can be used to link to this page
Your browser does not support the video tag.