My WebLink
|
Help
|
About
|
Sign Out
Home
Terraphase Engineering, Inc. CSA Amnd 1 20230913
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Terraphase Engineering, Inc. CSA Amnd 1 20230913
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 11:08:43 AM
Creation date
10/23/2023 4:14:38 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/29/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Certificate Of Completion <br />Envelope Id: A3E467C7B7E3497F87153F2DF618BEDB Status: Completed <br />Subject: Complete with DocuSign: Terraphase Soil Analysis CSA Amendment <br />Source Envelope: <br />Document Pages: 5 Signatures: 6 Envelope Originator: <br />Supplemental Document Pages: 25 Initials: 0 WPCP Admin <br />Certificate Pages: 6 <br />AutoNav: Enabled <br />EnvelopeId Stamping: Enabled <br />Time Zone: (UTC-08:00) Pacific Time (US & Canada) <br />835 E 14th St <br />San Leandro, CA 94577 <br />wpcpadmin@sanleandro.org <br />IP Address: 192.83.149.200 <br />Record Tracking <br />Status: Original <br /> 9/29/2023 9:36:11 AM <br />Holder: WPCP Admin <br /> wpcpadmin@sanleandro.org <br />Location: DocuSign <br />Security Appliance Status: Connected Pool: StateLocal <br />Storage Appliance Status: Connected Pool: City of San Leandro Location: DocuSign <br />Signer Events Signature Timestamp <br />Lucas Paz <br />lucas.paz@terraphase.com <br />Security Level: Email, Account Authentication <br />(None) <br />Signature Adoption: Pre-selected Style <br />Using IP Address: 70.165.63.90 <br />Sent: 9/29/2023 10:40:04 AM <br />Viewed: 9/29/2023 4:51:15 PM <br />Signed: 9/29/2023 4:55:05 PM <br />Electronic Record and Signature Disclosure: <br /> Accepted: 8/26/2022 11:08:25 AM <br /> ID: 1fc6d299-8533-4d40-a3f4-6427c3926ac3 <br />Supplemental Documents: Terraphase Soil Analysis CSA Update 2022 11 <br />21.pdf <br />Viewed: 9/29/2023 4:54:05 PM <br />Read: Not Required <br />Accepted: Not Required <br />Nick Thom <br />NThom@sanleandro.org <br />City Engineer <br />Signing Group: Engineering & Transportation <br />Security Level: Email, Account Authentication <br />(None) <br />Signature Adoption: Drawn on Device <br />Using IP Address: 107.115.29.109 <br />Signed using mobile <br />Sent: 9/29/2023 4:55:07 PM <br />Viewed: 10/3/2023 1:56:30 PM <br />Signed: 10/3/2023 3:15:36 PM <br />Electronic Record and Signature Disclosure: <br /> Accepted: 10/3/2023 1:56:30 PM <br /> ID: 515590e5-18e8-440d-a28b-02544badabe4 <br />Supplemental Documents: Terraphase Soil Analysis CSA Update 2022 11 <br />21.pdf <br />Viewed: 10/3/2023 3:15:16 PM <br />Read: Not Required <br />Accepted: Not Required <br />Richard Pio Roda <br />rpioroda@meyersnave.com <br />Principal <br />Signing Group: City Attorney <br />Security Level: Email, Account Authentication <br />(None) <br />Signature Adoption: Pre-selected Style <br />Using IP Address: 206.169.145.130 <br />Sent: 10/3/2023 3:15:38 PM <br />Viewed: 10/3/2023 3:36:35 PM <br />Signed: 10/3/2023 3:39:04 PM <br />Electronic Record and Signature Disclosure: <br /> Accepted: 10/3/2023 3:36:35 PM <br /> ID: 676acbdd-7cf1-41e1-97ac-425b5226cdad
The URL can be used to link to this page
Your browser does not support the video tag.