My WebLink
|
Help
|
About
|
Sign Out
Home
Brightview Landscape Services Inc NPSA Park Turf 20230918
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Brightview Landscape Services Inc NPSA Park Turf 20230918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 2:48:25 PM
Creation date
11/13/2023 2:48:05 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/18/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXTRA Price - Contractor to insert pricing here - Shown in $ or portions of a $ <br />PRICING <br />EP1 <br />Weed Abatement Parking Lot Island between Entrance <br />and Exit Driveway at Thrasher Park* <br />Monthly Fee fully <br />inclusive of any and all <br />required spraying 49.32$ <br />EP2 <br />Weed Abatement Manor Park - Permiter mulched area <br />adjacent to turf areas * <br />Monthly Fee fully <br />inclusive of any and all <br />required spraying 485.18$ <br />EP3 Spray Tree Wells * - Marina Park <br />Monthly Fee fully <br />inclusive of any and all <br />required spraying to <br />maintain standard 135.55$ <br />*Fee paid by City will be inclusive of all treatments need <br />to remove the weeds, not a per application fee. <br />EP4 Pest Control - Turf Areas Per Rodent Trap 46.50$ <br />EP5 Pest Control - Turf Areas - Baiting Per Hour 56.00$ <br />Labor Rates; inclusive of all wages, benefits, taxes <br />EP6 General Laborer (Basic Labor Tasks/Repairs) Hour 56.00$ <br />EP7 Irrigation Technician (General Irrigation Repairs) Hour 80.00$ <br />EP8 Irrigation Specialist (Technical Irrigation Repairs) Hour 80.00$ <br />EP9 Minimum Service Call Charge Per Call 300.00$ <br />EP10 Markup on material cost Percentage above cost thirty eight perce <br />EP11 Markup on subcontractor cost (if necessary) Percentage above cost twenty eight perc <br />Other Services <br />EP12 Aeration - Turf Per Square Foot 0.00510$ <br />EP13 <br />Fertilization - Turf -City will provide the fertilizer - this is <br />the application price only Per Square Foot 0.00250$ <br />EP14 Fertilization - Landscape Areas Per Square Foot 0.01825$ <br />EP15 Dethatching - Turf Per Square Foot 0.00800$ <br />EP16 <br />Broadleaf Spraying/Overseeding 30 days after treatment <br />- Seed application rate = 5lbs per 1000 square feet- Turf <br />Per Square Foot Per <br />Application 0.02300$ <br />EP17 <br />Sod-Turf (including labor and materials installed; remove <br />old)Per Square Foot 4.00000$ <br />BULK MATERIAL <br />EP18 Shredded Bark (including labor and material installed) Per cubic yard 150.00$ <br />EP19 Topsoil (including labor and material installed) Per cubic yard 145.00$ <br />EP20 Soil Amendment (including labor and material installed) Per cubic yard 145.00$ <br />EP21 <br />Bender/Headerboard (including labor and material <br />installed) 2x6 Benda board Per foot 20.00$ <br />EP22 <br />Compost/Mulch (including delivery, labor and material <br />installed Per Cubic Yard 150.00$ <br />Exhibit B <br />3 <br />DocuSign Envelope ID: 88C7DA92-A192-4D3B-8C30-0528956DCD71
The URL can be used to link to this page
Your browser does not support the video tag.