My WebLink
|
Help
|
About
|
Sign Out
Home
5D Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20231106
>
5D Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:56:36 PM
Creation date
12/15/2023 1:16:21 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/6/2023
Retention
PERM
Document Relationships
Reso 23-148 Silman Industries CSA
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
Silman Industries NPSA 20231212
(Amended)
Path:
\City Clerk\City Council\Agreements\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />City Council <br />Meeting Date: November 6, 2023 <br />Agenda Number: 5.d. <br />Agenda Section: CONSENT CALENDAR <br />File Number: 23-471 <br />File Type: Staff Report <br />Adopt a Resolution to Approve and Authorize the City Manager to Award a Construction Contract to <br />Silman Industries in the Amount of $96,579 for the Washington Manor Park Pool Tower Repair, Project <br />No. 2023.3400 to Authorize the City Manager to Negotiate and Approve Individual Change Orders Up to <br />10% (or $9,658) of the Original Contract Amount; and to Authorize the City Manager to Negotiate and <br />Approve Cumulative Change Orders Up to 25% (or $24,144) of the Original Contract Amount <br />COUNCIL PRIORITY <br />·Infrastructure <br />SUMMARY <br />This contract will provide for the repair and rehabilitation of the water slide tower for the <br />Washington Manor Park swimming pool. <br />RECOMMENDATIONS <br />Staff recommends the following actions: <br />·Award a construction contract in the amount of $96,579 to Silman Industries; <br />·Authorize the City Manager to negotiate and approve individual change orders up to 10% <br />(or $9,658) of the original contract amount; and <br />·Authorize the City Manager to negotiate and approve change orders up to a cumulative <br />amount of 25% (or $24,144) of the original contract amount . <br />BACKGROUND <br />The current Washington Manor Park swimming pool was constructed in 2005 but has been <br />closed to public use since 2022 because of observed deterioration of the swimming pool and <br />associated play structures. Staff started developing plans for the resurfacing of the pool and other <br />appurtenances and identified certain facilities such as the water slide tower that will need to be <br />repaired and rehabilitated before starting the main pool resurfacing work . <br />Analysis <br />On October 18, 2023, the City opened bids for the subject project. Two (2) bids were received <br />ranging from $96,579 to $99,019. The engineer’s estimate for the project was $93,450. Staff <br />recommends the award of the contract to Silman Industries. The bid is found to be responsive, <br />and Staff has verified that the contractor’s license is current with the Contracts State License <br />Board, as well as their registration with the California Department of Industrial Relations. <br />Page 1 City of San Leandro Printed on 11/1/2023
The URL can be used to link to this page
Your browser does not support the video tag.