Laserfiche WebLink
BID SUMMARYBID OPENINGVillalobos & Associates. Inc. Rosas Brothers Construction Spencon ConstructionDATE: September 20, 2023Date Approved: 9/14/2023 P.O. Box 110004 4731 Coliseum Way P.O. Box 1220TIME: 3:00 p.m.Campbell, CA 95011 Oakland, CA 94601 Danville, CA 94526LOCATION: City Clerk's OfficePhone: (408) 426-1274 Phone: (510) 534-1077 Phone: (925) 984-2581Fax: N/A Fax: (510) 534-5077 Fax: (925) 984-2585ITEMNO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST1 Mobilization per section 9-3.4 1LS $24,000.00 $24,000.00 $12,000.00 $12,000.00 $5,000.00 $5,000.00 $50,000.00 $50,000.002 Install curb and gutter per drawing 100 case 3101425 LF $145.81 $61,969.25 $52.00 $22,100.00 $130.00 $55,250.00 $130.00 $55,250.003 Install sidewalk per drawing 100 case 31018,545 SF $25.36 $216,701.20 $20.00 $170,900.00 $25.00 $213,625.00 $25.00 $213,625.004 Install 6” driveway per drawing 102 case 31011,130 SF $26.63 $30,091.90 $21.00 $23,730.00 $32.00 $36,160.00 $26.00 $29,380.005 Install 8” driveway per drawing 102 case 310112 SF $27.89 $334.68 $22.00 $264.00 $60.00 $720.00 $27.00 $324.006 Install wheelchair curb cut ramp per drawings 106A through 106D case 31012,000 SF $30.00 $60,000.00 $25.50 $51,000.00 $45.00 $90,000.00 $38.00 $76,000.007 Install basket weave sidewalk per drawing 112 case 3101400 SF $26.63 $10,652.00 $21.00 $8,400.00 $30.00 $12,000.00 $25.00 $10,000.008 Install vertical curb per drawing 118 case 310110 LF $30.87 $308.70 $50.00 $500.00 $100.00 $1,000.00 $60.00 $600.009 Install Concrete Apron per drawing 114 case 310120 SF $41.34 $826.88 $50.00 $1,000.00 $50.00 $1,000.00 $30.00 $600.0010 Install cast iron pipe curb drain per drawing 212 case 31014 LF $195.69 $782.78 $200.00 $800.00 $60.00 $240.00 $275.00 $1,100.0011 Remove and reset pavers at existing tree per drawing 436 case 310132 SF $44.10 $1,411.20 $30.00 $960.00 $60.00 $1,920.00 $40.00 $1,280.0012 Remove 4” Concrete and backfill with topsoil240 SF $13.78 $3,307.50 $10.00 $2,400.00 $15.00 $3,600.00 $5.00 $1,200.00ITEM COSTITEM COSTENGINEER'S ESTIMATEITEM COSTPROJECT TITLE:PROJECT NO.:BID NO.:QUANTITYAnnual Sidewalk Repair Program 23-242023.006023-24.005This document is a summary of bids received for the subject project and are provided only as a convenience. Listing of a particular bid is not a finding that such bid has been found to be responsive or accepted as complete by the City. An award of contract, if any, is subject to approval of the City Council and/or the City Manager. Contractors should refer to the contract documents for bidding information. Prepared by: D. GarciaAnnual Sidewalk Repair Program 23-24Page 1 of 8Printed 9/22/2023 @ 11:55 AM