My WebLink
|
Help
|
About
|
Sign Out
Home
5E Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20231106
>
5E Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:56:36 PM
Creation date
12/15/2023 1:16:23 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/6/2023
Retention
PERM
Document Relationships
Reso 23-149 Villalobos & Associates Inc. CSA
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID SUMMARYBID OPENINGVillalobos & Associates. Inc. Rosas Brothers Construction Spencon ConstructionDATE: September 20, 2023Date Approved: 9/14/2023 P.O. Box 110004 4731 Coliseum Way P.O. Box 1220TIME: 3:00 p.m.Campbell, CA 95011 Oakland, CA 94601 Danville, CA 94526LOCATION: City Clerk's OfficePhone: (408) 426-1274 Phone: (510) 534-1077 Phone: (925) 984-2581Fax: N/A Fax: (510) 534-5077 Fax: (925) 984-2585ITEMNO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST ITEM COSTITEM COSTENGINEER'S ESTIMATEITEM COSTPROJECT TITLE:PROJECT NO.:BID NO.:QUANTITYAnnual Sidewalk Repair Program 23-242023.006023-24.005This document is a summary of bids received for the subject project and are provided only as a convenience. Listing of a particular bid is not a finding that such bid has been found to be responsive or accepted as complete by the City. An award of contract, if any, is subject to approval of the City Council and/or the City Manager. Contractors should refer to the contract documents for bidding information. Prepared by: D. Garcia24 Relocate Roadside Sign on New Post per drawing 136 case 31013 EA $716.63 $2,149.88 $600.00 $1,800.00 $600.00 $1,800.00 $500.00 $1,500.0025 Install New Roadside Sign on New Post per drawing 136 case 31014 EA $799.31 $3,197.25 $700.00 $2,800.00 $1,000.00 $4,000.00 $750.00 $3,000.0026 Excavation resurfacing per drawing 122A, B, C case 3101: 6” thickness405 SF $30.32 $12,279.09 $8.00 $3,240.00 $15.00 $6,075.00 $17.00 $6,885.0027 Excavation resurfacing per drawing 122A, B, C case 3101: 9” thickness10 SF $35.83 $358.31 $10.00 $100.00 $40.00 $400.00 $22.00 $220.0028 Excavation resurfacing per drawing 122A, B, C case 3101: 12” thickness10 SF $41.34 $413.44 $12.00 $120.00 $40.00 $400.00 $25.00 $250.0029e removal remobilization due to nes1 EA$441.00$441.00 $1,000.00 $1,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.0030 Valley Gutter per Drawing 114 case 3101205 SF$44.10 $9,040.50 $52.00 $10,660.00$50.00 $10,250.00$40.00 $8,200.0031 Red Curb Paint60 LF$5.31$318.60 $7.00 $420.00$20.00 $1,200.00$20.00 $1,200.00TOTAL BASE BID:REQUIRED DOCUMENTATION:Agreement to be BoundSUBCONTRACTORS:$564,890.34Mountain EnterprisesStaff & Care Tree Service$371,764.00NONEYESYESBid BondSan Leandro Local Business$566,840.00$628,464.00YESYESAddendum #1-2YESYES25 % ParticipationGood Faith EffortAnnual Sidewalk Repair Program 23-24Page 3 of 8Printed 9/22/2023 @ 11:55 AMNO NONONONONOSUBMITTEDN/ASUBMITTEDN/ASUBMITTEDN/A
The URL can be used to link to this page
Your browser does not support the video tag.