My WebLink
|
Help
|
About
|
Sign Out
Home
Waterproofing Associates, Inc. NPSA 20231213
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Waterproofing Associates, Inc. NPSA 20231213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2023 2:37:52 PM
Creation date
12/26/2023 2:37:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
12/13/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Non-Professional Services Agreement between December 13, 2023 <br />City of San Leandro and Waterproofing Associates, Inc. —Exhibit A Page 3 of 5 <br />calculated from the date of the Notice to Proceed through the “Maximum Completion/Delivery Time” <br />indicated by the Contractor on their proposal for the completion work or delivery of the goods specified. <br />Failure of Contractor to complete the work or deliver the goods within the time allowed will result in <br />damages, and for each consecutive day in excess, the contractor shall pay to the City the sum of $100.00 <br />per calendar day. Such amount shall not be construed as a penalty but as a minimum value of liquidated <br />damages that may be deducted from payment due to the contractor if such delay occurs. <br />LICENSES: Contractor must possess current California Contractors License and DIR Registration for <br />duration of contract. Contractor must have all licenses, permits, qualifications, and approvals of whatsoever <br />nature that are legally required to practice their respective professions as specified in Section 7.4 of the <br />Non-Professional Services Agreement. <br />MEASUREMENTS: It is the responsibility of the Contractor to make all measurements to determine their <br />proposed price. The City will not be responsible for determining the quantities of materials necessary to <br />complete the work specified. <br />PERMITS: Unless otherwise specified herein, Contractor shall at their expense, obtain all permits and <br />licenses and pay all charges and fees necessary for the performance of the contract, and shall give all <br />public notices necessary for the lawful performance of the contract. <br />Contractor shall pay all taxes, levies, duties and assessments of every nature due in connection with any <br />work under the contract, shall make any and all payroll deductions required by law, and shall indemnify and <br />hold harmless the City from any liability on account of any and all such taxes, levies, duties, assessments <br />and deductions. <br />SPILL PREVENTION & CONTROL: The Contractor shall take precautions to prevent accidental spills <br />during the work under this contract and keep a stockpile of spill control materials, such as rags or <br />absorbents, readily accessible onsite. <br />In the event of a spill, the Contractor shall: <br />1. Report any hazardous materials spills immediately to the Alameda County Fire Department, the <br />Alameda County Hazardous Materials Division, and other state and local agencies as required by <br />state and local regulations. <br />2. Immediately contain and prevent leaks and spills from entering the storm drain system, and <br />properly clean up and dispose of the waste and clean up materials. <br />3. Not wash any spilled material into the streets, gutters, storm drains, or creeks. <br />STORM WATER BEST MANAGEMENT PRACTICES : To eliminate storm water pollution, the Contractor <br />shall implement effective control measures at construction sites. BMPs include schedules of activities, <br />prohibition of practices, general good housekeeping practices, operational practices, pollution prevention <br />practices, maintenance procedures, and other management procedures to prevent the discharge of <br />pollutants directly or indirectly to the storm drain system. <br /> The Contractor shall implement all applicable BMPs including but not limited to the following: <br /> All construction materials shall be stored at least ten feet away from inlets, catch basins, and curb <br />returns. <br /> Store materials that have the potential to be transported to the storm drain system, by storm runoff <br />or by a spill, under cover in a contained area or in sealed waterproof containers. <br />DocuSign Envelope ID: 893785FE-7543-420D-9AB4-B901CB399A41
The URL can be used to link to this page
Your browser does not support the video tag.