<br />Consulting Services Agreement between City of San Leandro and 6 November 2023 <br />Schaaf and Wheeler for TCD Design Exhibit A – Page 18 of 27 <br />• Topographic survey and boundary research <br />• Geotechnical investigations which include one geotechnical boring at each of the 6 sites. Borings <br />will extend approximately 11 to 18 feet below ground surface, which is approximately 5 feet below <br />the inverts of the proposed trash capture systems. Borings exclude the testing of soils for <br />environmental characteristics (i.e. hazardous substances) and assumes the soil cuttings will not <br />be hazardous waste by the landfill facility. Geotechnical investigations include traffic control, <br />private utility locating and USA marking, no-fee encroachment permits, County drilling permits, <br />backfill with cement grout and off-haul of non-hazardous spoils. <br />• Utility locating assumes three potholes at each project location, with one mobilization. Potholes <br />shall be completed per City Standard Plan 144. <br /> <br />Task 2.3 Environmental Clearances and Permit Applications <br />This task includes the preparation, submittal, and approval of typical regulatory agency permits needed <br />for completion of the project. <br />• Prepare required agency encroachment permits, including Caltrans, Alameda ACFC, and the <br />Alameda County Mosquito Abatement District. Assumes 2 coordination meetings with each <br />agency. <br />• This scope assumes one round of compiled comments from each agency based on the design <br />report and 70% PSE. <br />• City will pay or reimburse Consultant for permit application fees. <br />• Additional BCDC, CEQA and Aquatic Resources Agency permitting is specific to the final design <br />alternatives selected and will be determined after completion of the Basis of Design report. Costs <br />for completion of any necessary additional regulatory permits, supporting studies, and <br />documentation would be completed as a negotiated change order to this contract. <br /> <br />Tasks 2.4 - 2.7 Design Documents <br />This task involved the preparation of construction bid documents for the selected trash capture devices <br />recommended by the Basis of Design Report from Task 1.5 and assumes all 6 trash capture devices <br />would be included in one bid package. This task includes, but is not limited to the following items: <br />• Concurrently with field investigations, 30% PS&E (Plans, Specifications, and Estimate) will be <br />developed for review by the City to identify proposed structures, project configuration, <br />coordination items, maintenance, and construction access. Assumes a table of specification <br />contents. <br />• Submittal of 70% / 100% PSE. Construction drawings are to be furnished in AutoCAD using City <br />format. Technical specifications are to be prepared in MS Word, in accordance with the <br />Construction Specifications Institute (CSI) format. City to prepare front end special provisions. <br />Dewatering plan and water pollution control plan specification sections will be developed to <br />provide guidance and limitations to the contractor as part of the bid packages. <br />• Geotechnical engineer will review 100% design plans for concurrence. <br />• Incorporate recommendations and comments from City review. <br />• Structural engineering design work will be determined after completion of the Basis of Design <br />DocuSign Envelope ID: B1AAF39E-9A9A-4491-B2A9-FBDFD1CF7A5E