Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and 6 November 2023 <br />Schaaf and Wheeler for TCD Design Exhibit A – Page 20 of 27 <br /> <br />Deliverables and Schedule: <br />Completion of all contract work for the 70% PSE and initial permit applications and regulatory reviews is <br />expected to be complete within 22 weeks after the Notice to Proceed (NTP), based on the following <br />deliverable schedule: <br />• Hydraulic Evaluation and Cost Estimates – 4 weeks after NTP <br />• Draft Basis of Design Report and Conceptual Designs – 8 weeks after NTP <br />• Final Basis of Design Report – 12 weeks after NTP <br />• 30% Design PS&E and Field Investigation Data – 16 weeks NTP <br />• 70% Design PS&E, CEQA Documentation, and Permit Submittals – 22 weeks after NTP. <br />After completion of the 70% PS&E package, the Consultant shall submit the design for regulatory agency <br />permit reviews and comments. Completion of CEQA and regulatory permitting approvals is unpredictable <br />and could take several months. The consultant shall complete the project bid documents based on receipt <br />of agency comments as follows: <br />• 100% Design PS&E - 4 weeks after receipt of initial regulatory review comments on the permit <br />applications. <br />• Bid Documents - 2 weeks after final Regulatory Permit Approvals. <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: B1AAF39E-9A9A-4491-B2A9-FBDFD1CF7A5E