Laserfiche WebLink
LocationDescriptionSpecial Instructions/Exceptions to Baseline. Work also includes Baseline Maintenance ServicesMonthly Price* Annual CostL56 MacArthur Bl Planting strip on east side of street along freeway wall from Dowling Blvd south to Estudillo Ave exit, and two (2) islands on west side located at 1045 and 1077 Macarthur BlWeekly Trash and Debris removal $ 256.62 $3,079.44L57 MacArthur Bl Planting strip on east side under I-580 from Dowling Blvd northWeekly Trash and Debris removal $ 256.62 $3,079.44L58 MacArthur Bl Spray and remove weeds in medians and in planting strips from from Dutton south to Estudillo AveService level and frequency is required to meet technical specifications of 'weed free' $ 88.82 $1,065.84L59 Marina Bl Medians from San Leandro Blvd west to Merced St Weekly Trash and Debris removal $ 769.81 $9,237.72L60 Marina Bl Spray and remove weeds in medians and along rail crossings from San Leandro Blvd west to I-880. Service level and frequency is required to meet technical specifications of 'weed free' $ 118.43 $1,421.16L61 Merced St Medians between Fairway and Marina including small island at SE corner of Marina BlWeekly Trash and Debris removal $ 128.36 $1,540.32L61 Merced St Island with the Bonaire Neighborhood Entry sign at intersection of Wicks Blvd $ 128.36 $1,540.32L63 Merced St Corner lot at Wicks Blvd next to 14251 Merced St $ 256.62 $3,079.44L64 Merced St Center median on Wicks Blvd across from corner lot $ 256.62 $3,079.44L65 Parrot St Landscaping on both sides of the street between E. 14th St and Washington AveWeekly Trash and Debris removal $ 256.62 $3,079.44L66 San Leandro Bl Exterior of Siempre Verde Park on west side (fence line to curb), including the Veteran’s Memorial WallWeekly Trash and Debris removal $ 256.62 $3,079.44L67 San Leandro Bl Medians from Creekside Plaza south to E. 14th St. Weekly Trash and Debris removal $ 513.19 $6,158.28L68 San Leandro Bl Landscaping in planting strips (bulb-outs) from W. Estudillo to Thornton St.Weekly Trash and Debris removal $ 256.62 $3,079.44L69 San Leandro Bl Planted area under BART tracks from the bart station south to 2481 San Leandro Bl. Trim ivy back to curb. Spray and trim weeds including the area between the plants and the railroad tracks. Weekly Trash and Debris removal $ 513.19 $6,158.28L70 San Leandro Bl Planted area between private property fence line and sidewalk on south side beginning at Rose Drive and continuing east to end of fence line approximately 200 feet west of E. 14th StWeekly Trash and Debris removal $ 256.62 $3,079.44L71 San Leandro Bl Trim Ivy along east fence line of Boys & Girls Club located at 2200 San Leandro BlService is required quarterly at a minimum. No irrigation. No baseline services. $ 39.48 $473.76L72 San Leandro Bl Spray and remove weeds in all referenced medians and landscaped areas. Service level and frequency is required to meet technical specifications of 'weed free' $ 157.91 $1,894.92L73 San Leandro Bl Spray and remove weeds on east side of street along fence line from Estabrook St. to Marina Bl and from the Family Services Agency to Washington AveService level and frequency is required to meet technical specifications of 'weed free' $ 59.21 $710.52L74 San Leandro Bl Spray and remove weeds at empty lot at Coburn Ct Service level and frequency is required to meet technical specifications of 'weed free' $ 19.74 $236.88L75 School Street Raise tree’s and trim suckers along fence line at I-580 from 141st Ave to Russ Ave No irrigation. No baseline services. $ 22.21 $266.52L76 Springlake Dr Landscaped areas on the north side from flood control canal west to end of wall, 75 feet west of Peninsula St; and south side from flood control canal west to Washington Ave $ 384.93 $4,619.16L77 Springlake Dr Medians from Hesperian Blvd west to Washington Ave $ 1,026.43 $12,317.16L78 Springlake Dr Trim ivy on walls from Washington Ave to flood control channel on a quarterly basis Service is only required quarterly at a minimum. No irrigation. No baseline services. $ 78.96 $947.52Attachment C - Compensation