Laserfiche WebLink
24" Box Tree (including labor and materials installed; for <br />trees-install city provided stake/strap)Each 384.32$ <br />36" Box Tree (including labor and materials installed; for <br />trees-install city provided stake/strap Each 1,006.21$ <br />Flat-Ground Cover (including labor and materials <br />installed)Per Flat 56.91$ <br />Flat-Annual Color (including labor and materials installed)Per Flat 56.07$ <br />Sod-Turf (including labor and materials installed; remove <br />old)Per Square Foot 1.20$ <br />BULK MATERIAL <br />Shredded Bark (including labor and material installed)Per cubic yard 123.63$ <br />2x4 Cobble (including labor and material installed)Per cubic yard 257.57$ <br />Topsoil (including labor and material installed)Per cubic yard 153.07$ <br />Soil Amendment (including labor and material installed)Per cubic yard 137.99$ <br />Bender/Headerboard (including labor and material <br />installed) 2x6 Benda board Per foot 5.86$ <br />Boulders/Moss Rock (materials only)Per pound 0.10$ <br />Compost/Mulch (including delivery, labor and material <br />installed) Medians Per Cubic Yard 129.45$ <br />Compost/Mulch (including delivery, labor and material <br />installed) City Facilities Landscape area Per Cubic yard 129.45$ <br />Attachment C - Compensation <br />Extra Services