My WebLink
|
Help
|
About
|
Sign Out
Home
10A Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20231120
>
10A Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:57:18 PM
Creation date
12/26/2023 3:17:10 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/20/2023
Retention
PERM
Document Relationships
Ord 2023-012 Ord 2022- PLN21-0031 Rezoning
(Amended)
Path:
\City Clerk\City Council\Ordinances\2023
Reso 23-169 Reso 2022 - PLN21-0031 SPR, CUP, Adm Exception
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. 2023-XXX 16 <br />77. Pursuant to Government Code Section 66020, including Section 66020 (d) (1), the City HEREBY NOTIFIES <br />the applicant for this Project that the 90-day approval period (in which the applicant may protest the <br />imposition of any fees, dedications, reservations, or other exactions imposed on this Project by these <br />Conditions of Approval) will begin on the date of the conditional approval of this Project. If you fail to file a <br />protest within this 90-day period, complying with all the requirements of Government Code Section 66020, <br />you will be legally barred from later challenging any such fees, dedications, reservations or other <br />exactions. <br /> <br />78. The proposed development shall comply with City ordinances, policies, and regulations. All improvements <br />shall be in accordance with the City’s Design Standards, Specifications and Standard Plans unless otherwise <br />specifically approved by the City Engineer. <br /> <br />79. The applicant shall pay design review fees, permit fees, inspection fees, sewer connection fees, and any <br />other fees charged by the City or other reviewing agencies for the review, approval, permitting and <br />inspection of the public and/or private improvements. <br /> <br />80. The applicant shall have site improvements designed and stamped by a civil engineer registered to practice <br />within the State of California. Applicant shall obtain approval of the City Engineer for all on and off-site <br />improvements prior to the issuance of Building Permits for the project. <br /> <br />81. If the design of any site improvement requires encroachments onto neighboring properties during <br />construction, the applicant shall submit written agreements with that property owner to the City Engineer, <br />for review and approval, prior to approval of the building permit. <br /> <br />82. The applicant shall remove any unused driveways or damaged driveways, sidewalk, and curb and gutter <br />along the full property frontage and shall construct new City standard driveway, sidewalk, curb, and gutter <br />in place of the removed items. <br /> <br />83. A Grading Permit is necessary for this project. The requirements for said permit are indicated in San <br />Leandro Municipal Code §7-12. The Grading Permit can be processed prior to or concurrent with the <br />Building Permit(s). <br /> <br />84. The applicant shall comply with the regulations and provisions contained in the City’s Grading Ordinance, <br />the City’s Storm Water Pollution Prevention Permit, and the National Pollutant Discharge Elimination <br />System (NPDES), to the satisfaction of the City Engineer. More information may be found at <br />www.cleanwaterprogram.org. Storm water runoff from this site will need to be treated before it enters <br />the storm drain system. <br /> <br />85. The applicant shall comply with the following high standards for sanitation during construction of <br />improvements: Garbage cans, construction dumpsters, and debris piles shall be removed on a minimum <br />weekly basis. All food related trash items such as wrappers, cans, bottles, and food scraps shall be <br />disposed of in closed containers only and shall be regularly removed from the site. Inspections, conducted <br />as part of the regular construction compliance, will be conducted to ensure compliance of the Applicant <br />and contractors with this requirement. <br /> <br />86. All outdoor storage of parts and equipment shall be raised and covered. DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.