My WebLink
|
Help
|
About
|
Sign Out
Home
10A Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20231120
>
10A Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:57:18 PM
Creation date
12/26/2023 3:17:10 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/20/2023
Retention
PERM
Document Relationships
Ord 2023-012 Ord 2022- PLN21-0031 Rezoning
(Amended)
Path:
\City Clerk\City Council\Ordinances\2023
Reso 23-169 Reso 2022 - PLN21-0031 SPR, CUP, Adm Exception
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />14143-14273 Washington Avenue Warehouse Project <br /> <br />10 <br />Site Access, Circulation, and Parking <br />Vehicle access to the project site would be available via two existing two-way driveways on <br />Washington Avenue, located in the southeast and northeast corners of the project site, respectively. <br />Pedestrian access to the project site would be provided via concrete sidewalks along all sides of the <br />proposed structure, except alongside the 15 dock doors. These sidewalks would lead to exterior <br />stairwells and entryways. Pedestrian access to the warehouse would be provided via seven <br />pedestrian doors; three located on the structure’s north side, three on the structure’s eastern side <br />along Washington Avenue, and one located on the structure’s south side. Two doors, separated <br />from the project site driveway by a fence, would provide exterior access to the electrical room and <br />the fire pump room. Pedestrian entrances to the structure would be above grade and accessible via <br />concrete stairways. <br />The proposed project would be required to provide 49 vehicle parking spaces and 13 bicycle parking <br />spaces pursuant to the SLZC. A total of 64 vehicle parking spaces would be provided and 14 bicycle <br />parking spaces would be provided. Parking provided would exceed the requirement for off street <br />parking and loading for manufacturing and warehouse facilities, located along the northern, <br />southern, and western sides of the proposed warehouse structure. Three accessible parking spaces, <br />seven electric vehicle charging spaces, and one clean air vehicle space would be located on the <br />northern side of the project site. Remaining parking spaces would consist of 31 standard vehicle and <br />22 compact vehicle spaces. The drive aisle from each driveway on Washington Avenue would allow <br />vehicles to access a paved area in the western portion of the site, which would provide vehicle <br />maneuvering space adjacent to the 15 dock doors. There would be 14 bicycle parking spaces located <br />on the northern end of the proposed warehouse structure. <br />Table 1 provides a summary of parking to be provided on the project site. <br />Table 1 Parking Summary <br />Parking Number of Stalls <br />Vehicle 64 <br />Standard 31 <br />Compact 22 <br />Accessible 3 <br />Electric Vehicle – regular 7 <br />Clean Air Vehicle 1 <br />Loading space 2 <br />Bicycle 14 <br />Short-term 6 <br />Long-term 8 <br />Source: First Industrial Realty Trust 2022
The URL can be used to link to this page
Your browser does not support the video tag.