My WebLink
|
Help
|
About
|
Sign Out
Home
Bandwidth Lease Agreement 20231024
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Bandwidth Lease Agreement 20231024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 4:06:02 PM
Creation date
12/27/2023 4:05:36 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/24/2023
Retention
PERM
Document Relationships
5D Consent
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2023\Packet 20231120
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - MITIGATION MONITORING PROGRAM <br />June 2023 C-18 SF Bay Fiber Optic Cables Project <br /> <br /> <br /> <br />1 polychlorinated biphenyls (PCBs), polycyclic aromatic hydrocarbons <br />2 (PAHs), dioxins and furans, organochlorine pesticides (OCPs), and <br />3 California Administrative Metals (CAM-17) heavy metals. <br />4 e) Provisions for proper waste disposal at authorized facilities capable of <br />5 receiving the waste(s). <br />6 B. Bandwidth shall undertake development in accordance with the approved <br />7 final SWEMP. Any proposed changes to the approved final SWEMP shall be <br />8 reported to CSLC and San Mateo County Division of Environmental Health. <br />9 No changes to the approved final SWEMP shall occur without written <br />10 approval from CSLC and San Mateo County Division of Environmental Health. <br /> <br />11 Spill Contingency and Hazardous Materials Terrestrial Plan <br /> <br />12 Measures for terrestrial operations shall include, but not be limited to, identifying <br />13 appropriate fueling and maintenance areas for equipment, a daily equipment <br />14 inspection schedule, and spill response procedures including maintaining spill <br />15 response supplies on-site. The Spill Contingency and Hazardous Materials <br />16 Terrestrial Plan (SCHMTP) could be prepared separately or the elements of the <br />17 SCHMTP could be included in the SWEMP. <br /> <br />18 The terrestrial SCHMTP will identify the actions and notifications to occur if <br />19 contaminated soil is encountered during onshore excavation. Bandwidth shall <br />20 notify the of San Mateo and Alameda Counties’ Divisions of Environmental <br />21 Health within 24 hours of discovering contaminated materials during Project <br />22 construction activities. Work in the area suspected of contamination shall stop <br />23 until the notified agencies, together with Bandwidth, have determined the next <br />24 steps. <br /> <br />25 The terrestrial SCHMTP will identify, at a minimum, the following BMPs related to <br />26 using hazardous substances: <br />27 Follow manufacturer’s recommendations on use, storage, and disposal of <br />28 chemical products used in construction. <br />29 Avoid overtopping construction equipment fuel gas tanks. <br />30 During routine maintenance of construction equipment, properly contain <br />31 and remove grease and oils. <br />32 Conduct all fueling of equipment at least 100 feet from wetlands and <br />33 other waterbodies. <br />34 Properly dispose of discarded containers of fuels and other chemicals. <br />DocuSign Envelope ID: 8D8CF2E2-DF6D-4A11-B610-2B1544DD7C30
The URL can be used to link to this page
Your browser does not support the video tag.