Laserfiche WebLink
Page 6 of 35 <br />years from the date of written notice, b) complies with all the conditions of this <br />Lease, and c) submits an application and obtains approval from Lessor and to the <br />extent applicable, from the California State Lands Commission to restore the Lease <br />Premises. <br />10.Lessee agrees to submit no later than 2 years prior to the expiration of this Lease <br />either: (a) an application and minimum expense deposit for a new lease for the <br />continued use of the Lease Premises or (b) a plan for restoration of the Lease <br />Premises to be completed no later than the expiration of the Lease Term, <br />pursuant to Section 3, Paragraph 13. <br />11.Lessee must submit all required pre-construction documents and permits as <br />required by Section 2, Paragraphs 12, 13, and 14 for staff review and approval of <br />a Notice to Proceed. <br />12.At least fifteen (15) days prior to (i) start of the Horizontal Directional Drilling (HDD) <br />operation, and (ii) start of the marine cable laying activity, Lessee shall submit a <br />Local Notice to Mariners to the United States Coast Guard (USCG). A copy of each <br />published Notice shall be immediately filed by the Lessee with the Lessor. <br />13.At least thirty-five (35) days prior to the start of construction of the Project as <br />defined in the Mitigated Negative Declaration (MND), Lessee shall provide the <br />following for Lessor's review: <br />a)Engineering design drawings as issued for construction, certified (stamped, <br />signed, and dated) by a California Registered Civil/Structural Engineer, <br />showing details of the proposed cables/conduits and associated facilities of <br />the Project (terrestrial and marine) with key control points referenced to the <br />California Coordinate System (CCS83) and vertical profile data with elevations <br />referenced to Mean Lower Low Water (MLLW) datum, the North American <br />Vertical Datum of 1988 (NAVD 88), or other applicable local vertical control <br />datum in both plan view and profile. The drawings shall also show all existing <br />pipelines and utilities, and design separation between them and the proposed <br />cables/conduits in both plan view and profile. In addition, the drawings shall <br />delineate the Lease Premises. For the proposed cable/conduit segments to be <br />installed using the HDD method, the drawings shall provide information such as <br />pipe grade and material specifications, minimum bend radius, and <br />coordinates of the entry and exit points. <br />b)A site-specific geotechnical report certified (stamped, signed, and dated) by <br />a California registered Geotechnical Engineer, including boring logs, <br />confirmation of the fitness of purpose of the HDD method, and any <br />geotechnical recommendations for safe installations of HDD, cable landing <br />vaults, and cable laying of the Project. The report should also include the <br />DocuSign Envelope ID: 8D8CF2E2-DF6D-4A11-B610-2B1544DD7C30