EXHIBIT C - MITIGATION MONITORING PROGRAM <br />June 2023 C-20 SF Bay Fiber Optic Cables Project <br /> <br /> <br /> <br />1  Control measures of constructing a dugout or settling basin at the cable <br />2 landing site to contain drilling mud to prevent sediment and other <br />3 deleterious substances from entering waterbodies. <br />4  Requirements for onshore biological monitors to monitor onshore and <br />5 offshore to identify signs of an inadvertent release of drilling fluids, which <br />6 may include the use of Rhodamine dye. <br />7  An abandonment contingency plan in case the HDD operations are <br />8 forced to be suspended and a partially completed bore hole is <br />9 abandoned. <br />10  Complete list of the agencies (with telephone number) to be notified in <br />11 case of an inadvertent return of any size, including, but not limited to, the <br />12 CSLC’s 24-hour emergency notification number (562) 590-5201 and the <br />13 California Governor’s Office of Emergency Services (Cal OES) contact <br />14 number (800) 852-7550. <br /> <br />15 Location: Terrestrial Project areas <br />16 Monitoring/Reporting Action: Submit report to the CSLC at least 30 days before <br />17 starting construction. <br />18 Onshore and offshore biological monitors to identify signs of an inadvertent <br />19 release of drilling fluids. <br />20 Effectiveness Criteria: Implementation of this MM will reduce the potential for <br />21 impacts on wildlife species potentially present. <br />22 Responsible Party: Applicant and CSLC <br />23 Timing: Before and during construction <br /> <br />24 <br />25 <br /> <br />26 MM BIO-1: Provide Environmental Awareness Training (see Biological Resources) <br />27 MM BIO-3: Delineate Work Limits to Protect Sensitive Biological Resources (see <br />28 Biological Resources) <br />Other applicable MMs for potential impacts on hazards and hazardous <br />materials <br />DocuSign Envelope ID: 8D8CF2E2-DF6D-4A11-B610-2B1544DD7C30