My WebLink
|
Help
|
About
|
Sign Out
Home
Bandwidth Lease Agreement 20231024
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Bandwidth Lease Agreement 20231024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 4:06:02 PM
Creation date
12/27/2023 4:05:36 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/24/2023
Retention
PERM
Document Relationships
5D Consent
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2023\Packet 20231120
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - MITIGATION MONITORING PROGRAM <br />June 2023 C-20 SF Bay Fiber Optic Cables Project <br /> <br /> <br /> <br />1 Control measures of constructing a dugout or settling basin at the cable <br />2 landing site to contain drilling mud to prevent sediment and other <br />3 deleterious substances from entering waterbodies. <br />4 Requirements for onshore biological monitors to monitor onshore and <br />5 offshore to identify signs of an inadvertent release of drilling fluids, which <br />6 may include the use of Rhodamine dye. <br />7 An abandonment contingency plan in case the HDD operations are <br />8 forced to be suspended and a partially completed bore hole is <br />9 abandoned. <br />10 Complete list of the agencies (with telephone number) to be notified in <br />11 case of an inadvertent return of any size, including, but not limited to, the <br />12 CSLC’s 24-hour emergency notification number (562) 590-5201 and the <br />13 California Governor’s Office of Emergency Services (Cal OES) contact <br />14 number (800) 852-7550. <br /> <br />15 Location: Terrestrial Project areas <br />16 Monitoring/Reporting Action: Submit report to the CSLC at least 30 days before <br />17 starting construction. <br />18 Onshore and offshore biological monitors to identify signs of an inadvertent <br />19 release of drilling fluids. <br />20 Effectiveness Criteria: Implementation of this MM will reduce the potential for <br />21 impacts on wildlife species potentially present. <br />22 Responsible Party: Applicant and CSLC <br />23 Timing: Before and during construction <br /> <br />24 <br />25 <br /> <br />26 MM BIO-1: Provide Environmental Awareness Training (see Biological Resources) <br />27 MM BIO-3: Delineate Work Limits to Protect Sensitive Biological Resources (see <br />28 Biological Resources) <br />Other applicable MMs for potential impacts on hazards and hazardous <br />materials <br />DocuSign Envelope ID: 8D8CF2E2-DF6D-4A11-B610-2B1544DD7C30