My WebLink
|
Help
|
About
|
Sign Out
Home
Bandwidth Lease Agreement 20231024
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Bandwidth Lease Agreement 20231024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 4:06:02 PM
Creation date
12/27/2023 4:05:36 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/24/2023
Retention
PERM
Document Relationships
5D Consent
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2023\Packet 20231120
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - MITIGATION MONITORING PROGRAM <br />June 2023 C-22 SF Bay Fiber Optic Cables Project <br /> <br /> <br /> <br />1 <br /> <br />2 MM HAZ-1: Develop and Implement Spill Contingency and Hazardous Materials <br />3 Management Plans (see Hazards and Hazardous Materials) <br />4 MM HAZ-2: Prepare and Implement an Inadvertent Return Contingency Plan (see <br />5 Hazards and Hazardous Materials) <br /> <br />6 1.4.8 NOISE <br /> <br />7 <br /> <br />8 MM NOI-1: Implement Construction Noise Control Measures. The Applicant shall <br />9 ensure that its contractor implements specific noise attenuation measures to <br />10 ensure compliance with applicable City and County noise ordinances for the <br />11 duration of the construction period. Noise measures shall include the following <br />12 and shall be included in the construction specifications: <br /> <br />13 Limit construction activities to the hours specified in each local noise <br />14 ordinance. <br /> <br />15 Maintain all equipment in accordance with manufacturer's <br />16 recommendations to minimize noise emissions. <br /> <br />17 Inspect all gasoline and diesel-powered equipment to ensure they are <br />18 equipped with properly functioning exhaust mufflers and intake silencers. <br /> <br />19 Limit unnecessary idling. <br /> <br />20 Use low noise emission equipment where feasible and practical. <br /> <br />21 Location: Terrestrial Project areas <br />22 Monitoring/Reporting Action: Contract specifications <br />23 Effectiveness Criteria: Implementation of this MM will reduce the Project impacts <br />24 on sensitive receptors. <br />25 Responsible Party: Applicant and CSLC <br />26 Timing: Before and after construction <br />Potential Impact: Noise – Impacts on sensitive receptors <br />Other applicable MMs for potential impacts on hydrology and water quality <br />DocuSign Envelope ID: 8D8CF2E2-DF6D-4A11-B610-2B1544DD7C30
The URL can be used to link to this page
Your browser does not support the video tag.