My WebLink
|
Help
|
About
|
Sign Out
Home
Bandwidth Lease Agreement 20231024
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Bandwidth Lease Agreement 20231024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 4:06:02 PM
Creation date
12/27/2023 4:05:36 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/24/2023
Retention
PERM
Document Relationships
5D Consent
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2023\Packet 20231120
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - MITIGATION MONITORING PROGRAM <br />June 2023 C-24 SF Bay Fiber Optic Cables Project <br /> <br /> <br /> <br />1 1.4.10 TRANSPORTATION <br /> <br />2 <br /> <br />3 MM TRA-1: Marine Anchor Plan. At least 30 days before starting construction, <br />4 Bandwidth will submit a Marine Anchor Plan to CSLC staff for review and <br />5 approval with the following: <br /> <br />6 Map of the proposed acceptable anchor locations and exclusion zones <br />7 or offshore temporary anchoring or mooring for work vessels. <br />8 Narrative description of the anchor setting and retrieval procedures to be <br />9 employed that will result in minimal impacts on the bay sediments and <br />10 floor. Anchor dragging along the bay bottom is not allowed. <br />11 Coordinates of all dropped anchor points during construction shall be <br />12 recorded and included on the post-construction bay floor survey map. <br /> <br />13 Location: Marine Project area <br />14 Monitoring/Reporting Action: Provide plan to CSLC 30 days prior to construction <br />15 Effectiveness Criteria: Implementation of this MM will reduce the Project impacts <br />16 on local vessel traffic and provide safe anchoring. <br />17 Responsible Party: Applicant and Applicant’s contractor <br />18 Timing: Before and during construction <br /> <br />19 <br /> <br />20 MM TRA-2: Traffic Control Plan. Before starting the Project activities, a Traffic <br />21 Control Plan shall be submitted to CSLC staff for review and approval. It shall <br />22 include measures such as appropriate signage, detour routes, and lane closure <br />23 to reduce potential hazards to motorists and workers during the Project. In <br />24 addition, the Traffic Control Plan shall address measures to allow emergency <br />25 vehicle access, and reduction of impacts to circulation, potential hazards to <br />26 motorists, bicyclists, pedestrians, and workers during the Project. <br /> <br />27 Location: Terrestrial Project areas <br />28 Monitoring/Reporting Action: Provide plan to CSLC 30 days prior to construction <br />29 Effectiveness Criteria: Implementation of this MM will reduce the Project impacts <br />30 on local traffic. <br />31 Responsible Party: Applicant and Applicant’s contractor <br />32 Timing: Before construction <br />Potential Impact: Transportation – Reduce hazards on local roadways <br />Potential Impact: Transportation – Impacts on local marine vessel traffic <br />DocuSign Envelope ID: 8D8CF2E2-DF6D-4A11-B610-2B1544DD7C30
The URL can be used to link to this page
Your browser does not support the video tag.