Laserfiche WebLink
EXHIBIT C - MITIGATION MONITORING PROGRAM <br />June 2023 C-24 SF Bay Fiber Optic Cables Project <br /> <br /> <br /> <br />1 1.4.10 TRANSPORTATION <br /> <br />2 <br /> <br />3 MM TRA-1: Marine Anchor Plan. At least 30 days before starting construction, <br />4 Bandwidth will submit a Marine Anchor Plan to CSLC staff for review and <br />5 approval with the following: <br /> <br />6  Map of the proposed acceptable anchor locations and exclusion zones <br />7 or offshore temporary anchoring or mooring for work vessels. <br />8  Narrative description of the anchor setting and retrieval procedures to be <br />9 employed that will result in minimal impacts on the bay sediments and <br />10 floor. Anchor dragging along the bay bottom is not allowed. <br />11  Coordinates of all dropped anchor points during construction shall be <br />12 recorded and included on the post-construction bay floor survey map. <br /> <br />13 Location: Marine Project area <br />14 Monitoring/Reporting Action: Provide plan to CSLC 30 days prior to construction <br />15 Effectiveness Criteria: Implementation of this MM will reduce the Project impacts <br />16 on local vessel traffic and provide safe anchoring. <br />17 Responsible Party: Applicant and Applicant’s contractor <br />18 Timing: Before and during construction <br /> <br />19 <br /> <br />20 MM TRA-2: Traffic Control Plan. Before starting the Project activities, a Traffic <br />21 Control Plan shall be submitted to CSLC staff for review and approval. It shall <br />22 include measures such as appropriate signage, detour routes, and lane closure <br />23 to reduce potential hazards to motorists and workers during the Project. In <br />24 addition, the Traffic Control Plan shall address measures to allow emergency <br />25 vehicle access, and reduction of impacts to circulation, potential hazards to <br />26 motorists, bicyclists, pedestrians, and workers during the Project. <br /> <br />27 Location: Terrestrial Project areas <br />28 Monitoring/Reporting Action: Provide plan to CSLC 30 days prior to construction <br />29 Effectiveness Criteria: Implementation of this MM will reduce the Project impacts <br />30 on local traffic. <br />31 Responsible Party: Applicant and Applicant’s contractor <br />32 Timing: Before construction <br />Potential Impact: Transportation – Reduce hazards on local roadways <br />Potential Impact: Transportation – Impacts on local marine vessel traffic <br />DocuSign Envelope ID: 8D8CF2E2-DF6D-4A11-B610-2B1544DD7C30