Laserfiche WebLink
City of San Leandro <br />Installation Agreement – Att A <br />Page 5 of 17 <br /> <br />• Installation of one (1) new packaged rooftop unit. <br />• Duct/curb modifications needed to install unit. <br />• Disconnection/reconnection of the existing electrical and gas service. <br />• Installation of a new electrical disconnect. <br />• Installation of economizer and MERV 13 filters as per manufacturer’s recommendations. <br />• Protective coil coatings. <br />• Condensate connections. <br />• Connection to the new BAS. <br />• Start-up/testing of the new unit. <br /> <br />The Scope of Work excludes: <br />• Electrical and structural upgrades/modifications not specifically included in the scope. <br />• Roofing other than repairs required for new roof curb adapters. <br /> <br />Lighting Retrofit existing interior T8 fluorescent and incandescent lighting systems with new high efficiency <br />LED lighting systems. Please see the Lighting Summary in Attachment B for detailed information on <br />lighting scope, quantities, and locations. <br /> <br /> Retrofit existing exterior building-mounted CF lighting systems with new high efficiency LED lighting <br />systems. Please see the Lighting Summary in Attachment B for detailed information on lighting scope, <br />quantities, and locations. <br /> <br />Fire Station #10 <br />Controls <br /> Recommission the existing Johnson Controls BAS. <br /> <br />The Scope of Work includes: <br />• Verify control components wired to each controller, including disconnecting wire to <br />confirm failures are reporting correctly. <br />• Verify operation of all phases for each piece of HVAC equipment connected to the BAS <br />in heating, cooling and/or economizer modes. <br />• Verify valve and/or damper actuators are operating correctly according to the control <br />signals. <br />• Reprogram equipment occupied/unoccupied schedules and set points according to <br />facility occupied hours. <br />• Provide a system start-up and report indicating system deficiencies. <br />The Scope of Work excludes: <br />• Any repair or replacement of existing control system components. <br /> <br />Mechanical <br /> Replace three (3) split system HVAC units with new high efficiency units of similar size and capacity. <br />Please refer to the HVAC Mechanical Inventory for equipment size and location. <br /> <br />The Scope of Work includes: <br />DocuSign Envelope ID: 64BB0189-33AC-48E9-B1D7-D912FB4998D8