Laserfiche WebLink
City of San Leandro <br />Installation Agreement – Att A <br />Page 8 of 17 <br /> <br />• Disconnection/reconnection of existing condensate drain lines. <br />• Connection to the new BAS. <br />• Start-up/testing of the new units. <br /> <br />The Scope of Work excludes: <br />• Electrical and structural upgrades/modifications not specifically included in the scope. <br />Lighting <br /> Retrofit existing interior T8 fluorescent and CF lighting systems with new high efficiency LED lighting <br />systems. Please see the Lighting Summary in Attachment B for detailed information on lighting scope, <br />quantities, and locations. <br /> <br />Fire Station #13 <br />Controls <br /> Provide and install a new building automation system (BAS) to control one (1) HVAC unit. <br /> <br />The Scope of Work includes: <br />• Disconnection and removal of the existing thermostat. <br />• Installation of new control wiring as necessary. <br />• Installation of new wall mounted temperature sensor. <br />• Engineering, programming, commissioning, documentation, graphics, and start-up. <br />• Integration to the City’s existing Johnson Controls BAS network server. <br />The Scope of Work excludes: <br />• Any required upgrades or improvements to the existing network. <br />• Controls for existing evaporative cooling units, heating only units, ductless split system <br />units, and window AC units. <br /> <br />Mechanical Replace one (1) packaged HVAC unit with a new high efficiency unit of similar size and capacity. <br />Please refer to the HVAC Mechanical Inventory for equipment size and location. <br /> <br />The Scope of Work includes: <br />• Removal and proper disposal of the existing unit per EPA guidelines. <br />• Proper disposal or containment of refrigerant. <br />• Installation of one (1) new packaged unit. <br />• Necessary duct/curb modifications. <br />• Disconnection/reconnection of the existing electrical and gas service. <br />• Installation of new electrical disconnect. <br />• Protective coil coatings on the new unit. <br />• Installation of economizer and MERV 13 filters as per manufacturer’s recommendations. <br />• Disconnection/reconnection of existing condensate drain line. <br />• Connection to the new BAS. <br />• Start-up/testing of the new unit. <br /> <br /> <br />DocuSign Envelope ID: 64BB0189-33AC-48E9-B1D7-D912FB4998D8