My WebLink
|
Help
|
About
|
Sign Out
Home
5G Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2024
>
Packet 20240220
>
5G Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 4:16:04 PM
Creation date
2/23/2024 4:28:39 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/20/2024
Retention
PERM
Document Relationships
Gates & Associates, Inc CSA 20240305
(Amended)
Path:
\City Clerk\City Council\Agreements\2024
Reso 2024-012 Gates and Associates for Shoreline Park Project
(Amended)
Path:
\City Clerk\City Council\Resolutions\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />● Alameda County Fire <br />● Army Corps of Engineers (ACE) <br />● Bay Area Air Quality Management District <br />● Bay Conservation and Development Commission (BCDC) <br />● City of San Leandro Building Dept. <br />● East Bay Municipal Utility District <br />● PG&E <br />● National Marine Fisheries Service (NMFS) <br />● State Water Resources Control Board (for SWPPP) <br />● San Francisco Bay Regional Water Quality Control Board (RWQCB) <br />Subtask 5.1 – Utility Service Coordination <br />● Provide PG&E and AT&T application, coordinate fees and schedule of improvements <br />● Coordinate and review interim power options depending on construction phasing schedule <br />● Provide EBMUD application, coordinate fees and schedule of improvements <br />● Coordinate utility and City fiber connections and service loads as noted in Subtask 3.1 <br />● Coordinate final and interim grades with final utility locations, elevations and coverage <br /> <br />Subtask 5.2 Vulnerability Assessment <br />● Prepare a Vulnerability Assessment and an Adaptation Strategy for review by BCDC <br />Subtask 5.3 - Interagency Pre-Application Meeting <br />● Engage with the regulatory agencies as early as possible during project design development. The <br />Army Corps San Francisco District hosts monthly pre-application meetings via video conference that <br />are attended by numerous federal and state regulatory agencies <br />● Coordinate attendance at one interagency pre-application meeting, lead the preparation of materials <br />necessary to request an interagency meeting, and prepare a brief PowerPoint slide deck for the <br />meeting that shows the proposed design and potential impacts within each agency’s jurisdiction <br />● Present the project phases and the mitigation options (if the project is expected to result in a net <br />increase in Bay fill under Task 2.8) to the agencies at one of these meetings to request their feedback <br />and plan for obstacles. The results of this meeting will inform the content and appropriate permitting <br />pathways for each relevant agency, including guidance on whether the project phases must be <br />permitted together or can be permitted separately. <br />Subtask 5.4- San Francisco Bay Conservation and Development Commission Permitting <br />● Determine jurisdictional areas within the project area based on BCDC’s jurisdictional boundaries. <br />Determination of jurisdictional limitations will be compared to the limits calculated by past <br />consultants. If discrepancies are discovered, CONSULTANT will provide BCDC’s jurisdictional limits to <br />the project team in CAD or similar format so that the limits may be incorporated into all project <br />concepts and project plans. <br />● Prepare and submit either a Material Amendment information package (if BCDC has issued a permit <br />for this location in the past) or a Major Permit application package. Under each scenario, the BCDC <br />application package will be tailored to address any outstanding comments issued by BCDC’s DRB <br />and/or comments received from BCDC via the Interagency Meeting (Task 5.2) <br />● Categorize all project elements and calculate the size of each using language that parallels that which <br />BCDC typically uses in their comment letters and permits
The URL can be used to link to this page
Your browser does not support the video tag.