Laserfiche WebLink
<br />Non-Professional Services Agreement between February 13, 2024 <br />City of San Leandro and Econolite—Exhibit A Page 1 of 1 <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />Contractor shall perform the following scope of work: <br /> <br /> Verify existing 100Mb active fiber links on current core switch and note the intersection at the opposite end, <br />per the existing fiber distribution panel labeling in the toc. Run an IP scan on the network and note which IP <br />addresses are active on the network on existing core switch. <br /> Install new Etherwan core switches in the IT data center. Configure the core switches per San Leandro’s <br />existing IP and VLAN scheme. Run the new fc to lc fiber jumpers from the fiber distribution panel in the data <br />center to the rack where the new Etherwan switches are installed. <br /> Verify the same pre-existing 100Mb fiber links which were active on the old core switch are active on the <br />new core switches. Run an IP scan and verify the same IP addresses that were active on the original scan <br />are still active with the new core switches installed. <br /> After links and active IP addresses are verified, program new Etherwan switches from San Leandro’s <br />existing stock and replace the legacy linked up field switches with the new switches and verify the links are <br />active. <br /> Once verified, replace SFP modules at the new core switches and at the new field switches to upgrade the <br />links from 100Mb to 1Gb. <br /> After the upgrade, run an IP scan to make sure all of the original active IP addresses are reachable over the <br />new 1Gb fiber links. <br />DocuSign Envelope ID: 2BB9C5AB-B4F3-4145-A74A-6EE340375A13