<br />Consulting Services Agreement between City of San Leandro and <br />Gates & Associates, Inc for Staff Augmentation Exhibit A – Page 28 of 31 <br />● No off-site improvements (e.g. Monarch Bay Drive) are included with this scope of work <br />and are assumed to be completed by others. <br />● All Permits and Fees to be paid for by the City. <br />● Meetings are assumed to be held in the Bay Area or via remote conference. Meetings are <br />limited to the hours noted within the fee sheet. <br />● All drawings will be prepared in AutoCAD format. Building Information Modeling (BIM) is <br />not included to convert civil 3D design or existing conditions AutoCAD files into BIM <br />model files. All digital files including AutoCad, Adobe photoshop, In Design, Illustrator, <br />Word, Excel, and PDF’s shall be delivered to the City. <br />● Pile and post tension slab designs for building structure are not included within the <br />current scope of services <br />● Geotechnical Report: A DRAFT geotechnical report was previously provided by ENGEO <br />based on their work on the project in 2016 and 2017. ENGEO has provided scope to <br />provide an updated geotechnical report for the current project and proposed <br />improvements, including additional field exploration and laboratory testing. <br />● Sampling of dredging spoils can be performed ex-situ. Dredging spoils can be stockpiled <br />and characterized for reuse and/or disposal based on the quantity of dredging spoils <br />generated. Laboratory testing will be based on the desired reuse scenario or the <br />requirements of the receiving facility. <br />● Geotechnical testing and observation during construction is not considered in the current <br />scope. <br />● Electrical and ICT Exemptions Include: <br />● All Electrical and communication services will be replaced with new services as <br />needed for Phase 1 scope with consideration for future capacity for masterplan, <br />private areas not included. <br />● Audio/Visual Design, Security Systems, Security Cameras, Mechanical, Plumbing, <br />Outside Plant (OSP) cabling systems, Network Architecture, and Network <br />Hardware design and specifications are not included within the scope of services. <br />● Project related services associated with LEED and/or other third party Green <br />Building certifications, utility incentives or energy modeling are not included. <br />● Commissioning of services is not included. <br />● Design of temporary power for construction will be performed by the contractor <br />or by others <br />● Structural calculations for the seismic restraint and anchorage of equipment are <br />not included. <br />● Changes to the Electrical ICT design related to change orders initiated by others, <br />supply chain issues, ASI’s, and/or value engineering are not included. <br />● Dry Utility Exemptions Include: <br />○ Phasing of utility demolition and dry utility services <br />○ Rule 20 undergrounding of offsite areas <br />○ It is anticipated that the relocation of existing PG&E electrical lines and <br />communication lines within the limits of work is not required. <br />○ Gas design services, demolition and or relocation <br />DocuSign Envelope ID: 30A47DAA-8ADC-4C81-A393-00F3D4407ED9