Laserfiche WebLink
in order to comply with the specific AHSC Program Threshold Requirement stated in <br />Section 106(a)(12)(A) of the 2024 AHSC Program Guidelines dated December 14, 2023 <br />(the “Transportation Agency Prior Experience Threshold Requirement”). This section of <br />the guidelines dictates that applicants must demonstrate prior experience by providing <br />evidence of at least two prior projects that are similar to the proposed AHSC project in <br />scope and size, which have been completed by the applicant, or joint applicant, during the <br />ten (10) years preceding the application due date. This section of the guidelines also <br />states that the applicants may demonstrate the requisite experience by using the past <br />experience of work completed of a non-applicant so long as the applicants can provide an <br />executed agreement with that specific non-applicant for the completion of the related <br />work in the AHSC Application for which funding is sought. The purpose of this <br />Agreement is to, amongst other things, comply with the Transportation Agency Prior <br />Experience Threshold Requirement. <br />⦁ The District is a non-applicant, but, as set forth herein, will have obligations to <br />perform the following specific BART STI Improvements and BART TRA Improvements, <br />included in the AHSC Application (collectively, the “Transit Obligations”): <br />⦁ BART STI Improvements: Not applicable <br />⦁ BART TRA Improvements: BART will (a) as part of a project to <br />replace and modernize all of BART's platform display signs, <br />replace signs at Bay Fair BART station. These new next generation <br />passenger information train destination sign units (DSU) are to be <br />future-proof, modular, with mechanisms to monitor the health of <br />the display hardware, (b) purchase and install signs to improve <br />customer experience with wayfinding, loading, and parking, and <br />(c) upgrade the station lighting to LEDs. <br />⦁ The District can demonstrate prior experience and provide evidence of at least <br />two prior projects that are similar in scope and size which have been completed during <br />the ten (10) years preceding March 19, 2024. Below is a list of these projects: <br />⦁ TRA. Concord BART Station Plaza Improvements: An upgrade of the <br />exterior public spaces surrounding the Concord BART station <br />entrance for a more context-sensitive design that improves the <br />safety and livability of the station area. The project improved <br />multimodal transfer waiting areas and enhanced pedestrian and <br />bicycle connections to surrounding neighborhoods. Areas <br />improved included the existing plaza and pedestrian paseo to the <br />west of the station, bus transfer area, station entrance and ticket <br />vending area, and pedestrian connections east of the station. <br />Completion date: July 27, 2018. <br />2