Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and <br />BKF for Shoreline Park at the Marina Exhibit A – Page 4 of 4 <br />Optional Services <br />1. Wetland Delineation: A wetland delineation will be conducted to identify the extent of existing <br />jurisdictional waters for the public parcels on the site. The delineation will be prepared using US <br />Army Corps of Engineers (Corps) methodology, with a total of up to 10 data sample points taken as <br />necessary to confirm any wetland features and extent of regulated waters. The estimated high <br />water mark, top of bank, and boundary between potential wetlands and uplands will be plotted <br />using rational methodology, and mapped to show jurisdictional features. This task includes <br />attendance at a single field verification meeting with a Corps representative, and minor revisions to <br />the original delineations. If extensive revisions or further detailed analysis is requested by the <br />Corps, this scope and cost would have to be expanded. The verified wetland delineation would <br />provide the City with a clear understanding of the limits of jurisdictional waters at the site. <br /> <br />2. 3D renderings: Meet with City staff to review locations and views for up to six (6) 3D rendering <br />views at the following locations: elbow, promenade, bridge node, south basin/boat launch, hotel <br />node and apartment node. Develop 3D Sketchup file which includes landscape features of specific <br />development area view which may include play structures, shade elements, walls, sidewalks, <br />planting areas, site furniture, railings, and gardens. It is assumed that all architectural background <br />information and modeling of proposed architecture will be provided by the Prime Developer’s <br />consultant team, and is not within the scope of this rendering service. <br /> <br />3. Kayak Launch Dock: The consultant team will provide analysis and conceptual design, up to 30% <br />design level, of one kayak launch dock that would face the interior basin The analysis would <br />include addressing accessibility, materials for walking surface, slope stabilization and fill associated <br />with the launch ramp. <br /> <br />4. Conceptual Bridge Abutment Design: The consultant team will provide conceptual design of the <br />future bridge abutments for space planning purposes. The future bridge will be shown on the <br />BCDC plan review set if this feature is required to obtain design approval. <br /> <br /> <br />DocuSign Envelope ID: 5165BDF7-B7E7-4364-9995-BB0EC8A21F0EDocuSign Envelope ID: 8072AF55-5E04-4E15-BB69-8A23564F49F9