My WebLink
|
Help
|
About
|
Sign Out
Home
BKF Engineers CSA Amnd3 20240411
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
BKF Engineers CSA Amnd3 20240411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 4:38:44 PM
Creation date
4/15/2024 5:01:17 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/11/2024
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and <br />BKF for Shoreline Park at the Marina Exhibit B – Page 3 of 4 <br />Project Engineer/Geologist/Seismologist $208.00 <br />Environmental Scientist $192.00 <br />Staff Engineer/Geologist/Seismologist $188.00 <br />Assistant Engineer $150.00 <br />Construction Services Manager $180.00 * <br />Senior Field Representative $163.00 */** <br />Senior Field Representative I $148.00 */** <br />Field Representative $133.00 */** <br />Environmental Technician $138.00 */** <br />Senior Laboratory Technician $165.00 <br />Laboratory Technician $150.00 <br />Senior CAD Specialist $158.00 <br />Senior GIS Analyst $173.00 <br />GIS Analyst $163.00 <br />CAD Specialist $148.00 <br />Network Administrator $205.00 <br />Project Assistant $122.00 <br /> <br />* Two-hour minimum portal to portal and cancellations within 24 hours. <br />* OVERTIME RATES: Rates increased by factor of 1.5 for all hours worked in excess of eight (8) Monday <br />through Friday, and the first eight (8) hours worked on Saturday. Rates increased by factor of 2.0 for all <br />hours worked in excess of twelve (12) Monday through Friday, all hours worked in excess of eight (8) on <br />Saturday and all hours worked on Sunday and holidays. <br />** For Prevailing Wage projects, increase the hourly rate by $15. <br />** Rates increased by factor of 1.25 for night shift hours (hours commencing after 4:00 p.m. or before 4:00 <br />a.m.); rates increased by factor of 1.875 (an additional factor of 1.5) for all night shift hours in excess of <br />eight (8). <br /> <br />Giacalone Design Services Rates <br />Principal $250.00 <br />Project Manager $200.00 <br />PG&E Applicant Designer $175.00 <br />Lighting Designer $110.00 <br />Drafter $95.00 <br />Job Administrator $75.00 <br /> <br />TBD Consultants Rates <br />Principal $235 <br />Project Manager $205 <br />Senior Estimator / MEP Estimator $205 <br />Senior Project Controller / Senior Scheduler $205 <br />Estimator / Scheduler / Project Controller $195 <br />Assistant Estimator / Assistant Project Controller $165 <br />Administrative / Technical Support $95 <br /> <br /> <br />DocuSign Envelope ID: 5165BDF7-B7E7-4364-9995-BB0EC8A21F0EDocuSign Envelope ID: 8072AF55-5E04-4E15-BB69-8A23564F49F9
The URL can be used to link to this page
Your browser does not support the video tag.